Midstate Electric Cooperative power line relocation environmental assessment

Show full item record

Title: Midstate Electric Cooperative power line relocation environmental assessment
Author: Bend-Fort Rock Ranger District (Or.)
Abstract: Proposes to reroute a portion of an existing 69-kV power line by constructing a power line corridor for approximately 3.5 miles. Includes removing trees from approximately 12.6 acres, clearing trees, drilling 10-foot deep holes to install wooden utility polls 70 feet high, and installing conductor wire. About 3.5 miles of existing power line would be removed from federal and private land.
Description: 45 pp. Tables, references, maps. Township 18 South, Range 11 East, Sections 10, 11, 14, 15 & 22. Captured May 17, 2007.
URI: http://hdl.handle.net/1794/6921
Date: 2005-10