Tumalo Creek bridge to bridge restoration environmental assessment

Show full item record

Title: Tumalo Creek bridge to bridge restoration environmental assessment
Author: Bend-Fort Rock Ranger District (Or.)
Abstract: Proposes to promote a more stable channel and restore the hydrologic function of Tumalo Creek after the change in stream dynamics following the 1979 Bridge Creek Fire. Includes restoring the channel dimension, pattern, and profile, implemented in multiple phases to restore nearly 2.8 miles of stream to reduce steam bank erosion and sedimentation , reduce the loss of wetlands, improve water quality and fish habitat, reconnect the creek to the floodplain, and restore riparian vegetation. Actions include grass seeding and tree and shrub planting, and the use of log jam and vane structures, boulder cross and J-hook vanes, side channels, and side channel pools with debris jams.
Description: 79 pp. Tables, maps, plans, appendices, illus. Township 18 South, Range 10 East, Sections 8, 9, and 10. Captured May 18, 2007.
URI: http://hdl.handle.net/1794/6936
Date: 2004-08


Files in this item

Files Size Format View
Tumalo_Creek_Bridge_to_Bridge_Restoration_EA.pdf 2.251Mb PDF View/Open

This item appears in the following Collection(s)

Show full item record