Tumalo Creek bridge to bridge restoration environmental assessment

Datum

2004-08

Zeitschriftentitel

ISSN der Zeitschrift

Bandtitel

Verlag

Zusammenfassung

Proposes to promote a more stable channel and restore the hydrologic function of Tumalo Creek after the change in stream dynamics following the 1979 Bridge Creek Fire. Includes restoring the channel dimension, pattern, and profile, implemented in multiple phases to restore nearly 2.8 miles of stream to reduce steam bank erosion and sedimentation , reduce the loss of wetlands, improve water quality and fish habitat, reconnect the creek to the floodplain, and restore riparian vegetation. Actions include grass seeding and tree and shrub planting, and the use of log jam and vane structures, boulder cross and J-hook vanes, side channels, and side channel pools with debris jams.

Beschreibung

79 pp. Tables, maps, plans, appendices, illus. Township 18 South, Range 10 East, Sections 8, 9, and 10. Captured May 18, 2007.

Schlagwörter

Forest management -- Oregon -- Deschutes National Forest, Stream restoration -- Oregon -- Deschutes National Forest, River channels -- Oregon -- Deschutes National Forest

Zitierform