Madras fiber optic line project (phase 2) environmental assessment

Show full item record

Title: Madras fiber optic line project (phase 2) environmental assessment
Author: Crooked River National Grassland (Or.)
Abstract: Proposes installation of a new fiber optic line, primarily on existing poles, within the existing right-of-way for the Central Electric Cooperative, Inc. (CEC) power transmission line. Designed to complement the earlier phase in providing broadband access to rural areas while causing the least ground disturbances, the project includes manually hanging fiber cable on 18 miles of existing CEC overhead poles with brackets, replacing two decaying wooden poles, and supplying weed-free grass and herb seed with which to cover replacement pole locations.
Description: 35 pp. Maps, table, references. The fiber optic project begins in T. 11 S., R. 14 E., and ends at the T13S/T14S boundary. Captured May 30, 2007.
URI: http://hdl.handle.net/1794/7201
Date: 2003-03-26


Files in this item

Files Size Format View
Madras_Fiber_Optic_Line_Phase_2_EA.pdf 1.283Mb PDF View/Open

This item appears in the following Collection(s)

  • NEPA Documents
    Documents required by the National Environmental Policy Act.

Show full item record