Pacific Power right-of-way renewal record of plan conformance and categorical exclusion determination

Show full item record

Title: Pacific Power right-of-way renewal record of plan conformance and categorical exclusion determination
Author: United States. Bureau of Land Management. Lakeview District
Abstract: Categorically excludes right-of-way renewal project of a 12 KV underground power-line that runs approximately 3800 feet long and 10 feet wide across BLM lands. The original construction of the power line was granted in 1977, serves customers of Pacific Power, and is a FLPMA right-of-way.
Description: 5 pp. Tables, appendices, map. T. 38S., R11E., Sections 14 S2SE & 23 E2NE. Captured August 8, 2007.
URI: http://hdl.handle.net/1794/7393
Date: 2007-05-31


Files in this item

Files Size Format View
Pacific_Power_R ... rical_Exclusion_Review.pdf 1.407Mb PDF View/Open

This item appears in the following Collection(s)

Show full item record