Browsing Local and Regional Documents Archive by Subject "Roads -- Oregon -- Washington County -- Design and construction"

Navigation

Display Options

Results

  • Metro (Or.) (Metro (Or.), 2004-11-03)
    The Highway 217 Corridor Study is being completed in two phases. The first phase developed and analyzed a wide range of multi-modal alternatives. Based on this evaluation, the alternatives will be refined to a smaller ...
  • Washington County (Or.). Dept. of Land Use and Transportation; Washington County (Or.) (Washington County (Or.), 1996-02)
    The general purposes of the CIP include 1) evaluating capital project needs identified in the Transportation Plan for implementation over the coming five-year period, 2) encouraging and guiding the efficient allocation ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics