Browsing Local and Regional Documents Archive by Subject "Transportation -- Oregon -- Gresham -- Planning"

Navigation

Display Options

Results

  • Gresham (Or.) (City of Gresham (Or.), 2007-06-19)
    The Capital Improvement Program (CIP) is a 5 year forecasted estimate which identifies major projects requiring the expenditure of public funds over and above routine annual operating expenses. The City identifies capital ...
  • Gresham (Or.) (City of Gresham (Or.), 2008-07-01)
    The Capital Improvement Program (CIP) is a 5 year forecasted estimate which identifies major projects requiring the expenditure of public funds over and above routine annual operating expenses. The City identifies capital ...
  • Gresham (Or.); Otak, Inc.; DKS Associates (City of Gresham (Or.), 2002-02-05)
    The Gresham/Fairview Trail is a regionally significant project which will provide many benefits to the community. The trail was identified in the 1995 Gresham Parks, Recreation and Open Space Master Plan, the 1996 ...
  • Gresham (Or.) (City of Gresham (Or.), 2009-04-10)
    Applicable goals and policies that relate to the provision of public facilities in the existing comprehensive plan for the City of Gresham also apply to the Kelley Creek Headwaters PFP. [From the Plan]
  • Gresham (Or.) (City of Gresham (Or.), 1991-09)
    The Gresham section of the Springwater Trail Corridor being developed within the abandoned Portland Traction Company railroad right-of-way will form a significant segment of the 40 Mile Loop regional trail system, and is ...
  • Gresham (Or.); Gresham (Or.). Dept. of Environmental Services. Transportation Engineering (City of Gresham (Or.), 2009-01-23)
    This study is in response to the 2007 Rockwood-West Gresham Urban Renewal Industrial Opportunity Study, which recommended that a traffic study be done for the NE 181st Avenue corridor between NE Sandy Boulevard and NE ...
  • Gresham (Or.); Gresham Redevelopment Commission; Marketek, Inc.; Urbsworks; David Evans and Associates (City of Gresham (Or.), 2005-06-30)
    The charge to the project team was to prepare: a Design Vision for the Rockwood Town Center; a Street Plan that maximizes neighborhood circulation and encourages pedestrian, bicycle and transit travel; a Market Analysis ...
  • Gresham (Or.); David Evans and Associates; Sea Reach Ltd.; Studio Reedijk (City of Gresham (Or.), 1997-08)
    The 1995 City of Gresham Parks, Recreation & Open Space Master Plan recommends the development of a Trails Master Plan to define "a comprehensive trail system which integrates with the City's pedestrian and bicycle plan ...
  • Gresham (Or.); Gresham (Or.). Community & Economic Development Dept. (City of Gresham (Or.), 2002)
    The Gresham Transportation System Plan (TSP) is a 20- year blueprint for implementing a multi-modal transportation system. The Plan establishes policies and provides strategies that support the development of Gresham ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics