Burlington-Northern Railway wants to replace the existing building on the communication site with a new prefabricated concrete structure. The new construction will be within the footprint of the Burlington Right-of-way grant -- ORE 15790.
Description:
6 pp. Map, appendix, illus. T40S, R7E Sec. 23 SW 1/4 SW 1/4. Captured January 23, 2009.