dc.contributor.author |
United States. Bureau of Land Management. Vale District |
|
dc.date.accessioned |
2009-02-27T22:49:05Z |
|
dc.date.available |
2009-02-27T22:49:05Z |
|
dc.date.issued |
2008-04-07 |
|
dc.identifier.uri |
http://hdl.handle.net/1794/8667 |
|
dc.description |
4 pp. T 34 S, R 45 E, Section 35 (SW 1/4 of SE 1/4). Captured July 8, 2008. |
en |
dc.description.abstract |
Announces decision approving project replacing the North Fork Owyhee River (Fenwick
Ranch Road) Bridge with a new single-span bridge to be located adjacent to the
existing bridge on the downstream side. The existing bridge would remain in place during construction and would serve
as a detour bridge. The new single-span bridge would span the entire river. The
only in-water work would be removal of the existing bridge pier after construction
of the new bridge. Malheur County has made application to the BLM for
a Right-of-Way/Temporary Use Permit for the construction equipment staging area and
the actual bridge project. |
en |
dc.language.iso |
en_US |
en |
dc.relation.ispartofseries |
NEPA; |
|
dc.subject |
Right of way -- Oregon -- Vale Region |
en |
dc.subject |
Bridges -- Design and construction -- Environmental aspects -- Oregon -- Vale Region |
en |
dc.subject |
Public lands -- Oregon -- Vale Region -- Management |
en |
dc.title |
Fenwick Ranch Road bridge replacement decision record |
en |
dc.title.alternative |
Decision record: Fenwick Ranch Road bridge replacement |
en |
dc.type |
Other |
en |