Clackamas side channel and culverts environmental assessment

Show full item record

Title: Clackamas side channel and culverts environmental assessment
Author: Mt. Hood National Forest (Agency : U.S.)
Abstract: The project would reconnect a side channel of the Clackamas River (near mile post 35) using a back hoe to create a small channel connected to the river at both ends. Logs would be installed to add structure and pools. It would also replace two culverts with bridges that allow better passage of fish. One is at the junction of Bargfeld Creek and Fischers Mill Road and the other is at the junction of Spring Creek and Mattoon Road.
Description: 19 pp. Maps, tables. Section 27 of T. 4 S. R. 5 E., and sections 44 and 45 of T. 3 S. R. 3 E. Captured March 6, 2009.
URI: http://hdl.handle.net/1794/8727
Date: 2007


Files in this item

Files Size Format View
Clackamas_Side_Channel_and_Culverts_EA.pdf 303.1Kb PDF View/Open

This item appears in the following Collection(s)

Show full item record