Browsing Willamette National Forest by Issue Date

Navigation

Display Options

Results

  • Willamette National Forest (Agency : U.S.); United States. Bureau of Land Management. Salem District; U.S. Fish and Wildlife Service. Oregon State Office (1998-08)
    Analyzes terrestrial habitats in 11 designated LSRs on lands managed by the Willamette National Forest and the Salem and Eugene Bureau of Land Management Districts as required by the Northwest Forest Plan. Seeks to maintain ...
  • Willamette National Forest (Agency : U.S.) (1999-04-26)
    Proposes to apply new standards and guidelines to update the current Integrated Weed Management program through a non-significant amendment, by adding potential and new invaders to the 1993 list, and prescribing treatment ...
  • Willamette National Forest (Agency : U.S.) (1999-09-02)
    Announces decision to implement Alternative 2 of the 1999 Integrated Weed Management environmental assessment, continuing a program of noxious weed treatment based on the type of infestation for 205 populations of weeds. ...
  • McKenzie River Ranger District (Or.) (2001-06)
    Proposes to fall 205 hazardous trees on 22 acres adjacent to state and federal highways, and include 171 trees in a salvage timber sale that would yield an estimated 100 thousand board feet. The remaining 34 trees, including ...
  • Detroit Ranger District (Or.) (2001-12)
    The proposed action is to adopt the Opal Creek SRA Management Plan developed by the Opal Creek SRA Advisory Council, in consultation with the Forest Service, as management direction for the Congressionally designated Opal ...
  • Detroit Ranger District (Or.) (2002-06)
    Proposes to convert and reconstruct the Upper Arm Recreation Site to a formal day-use site with picnic, swimming, fishing, hiking, boat-in and interpretive facilities, while eliminating the five existing campsites. ...
  • McKenzie River Ranger District (Or.) (2002-06)
    Proposes to rehabilitate the 52 year-old West Fork Horse Creek Bridge on Delta Road, including structural repairs throughout, and replacement of portions of the deteriorated glulam truss members. A temporary bridge would ...
  • McKenzie River Ranger District (Or.) (2002-06-14)
    Proposes actions to develop an interpretive gateway facility to the historic Fish Lake Remount Depot, educating the public about the site's significance, making historic features more visible and accessible, and controlling ...
  • Detroit Ranger District (Or.) (2002-06-26)
    Announces decision to implement Alternative 6 of the plan EA, specifically addressing the issue of allowing recreation use to increase in the Moderate Intensity Zone, and to allow activities that occurred on the date of ...
  • McKenzie River Ranger District (Or.) (2002-07)
    Proposes to fall about 204 hazardous trees in 18 acres adjacent to Forest Service Road 19, and include 168 trees in a salvage timber sale that would yield an estimated 200 thousand board feet. The remaining 36 trees would ...
  • Detroit Ranger District (Or.) (2002-07)
    Proposes to thin approximately 1136 acres of second growth Douglas fir stands to reduce stocking levels, thin selected portions of riparian reserves, reconstruct roads, and build temporary roads in order to enhance the ...
  • Detroit Ranger District (Or.) (2002-07)
    Announces decision to implement Alternative 3 of project EA, which modifies the action to include operating restrictions for helicopter, timber harvest, and truck hauling to reduce the effects of noise on recreation visitors ...
  • Sweet Home Ranger District (Or.) (2002-08-02)
    Proposes to offer one or more timber sales treating no more than 275 acres in the Parks Creek Subwatershed. Timber will be removed from the existing shelterwood and overstory management prescriptions with ground-based ...
  • Detroit Ranger District (Or.) (2002-10-29)
    Announces decision to implement Alternative 4 eliminating the built-in mooring docks and the conceptual design changes in Alternative 5, converting and reconstructing the Upper Arm Recreation Site to a formal day-use site ...
  • Detroit Ranger District (Or.) (2002-12)
    Proposes to treat eight forest stands totaling an estimated 187 acres within the East Humbug Creek drainage by removing most trees below 11 inches in diameter by either commercial thinning or understory removal or a ...
  • Willamette National Forest (Agency : U.S.) (2003-01)
    Provides line officers with ongoing critical information for the operation and maintenance of a safe and affordable road system that is responsive to public needs and meets land management objectives with minimal negative ...
  • McKenzie River Ranger District (Or.) (2003-03)
    Proposes to implement portion of recommendations found in the Blue River Landscape Strategy, a recommended landscape management and watershed restoration plan, an administrative study designed to measure effects on the ...
  • Sweet Home Ranger District (Or.) (2003-03-11)
    Announces decision to implement Article 3 of the project EA, harvesting 3.2 million board feet on 237 acres of existing shelterwood and prelogged overstory units in Matrix land allocation using ground-based logging methods. ...
  • Detroit Ranger District (Or.) (2003-04-14)
    Announces decision to decommission .8 miles of road, including Road 2234-175 and its spurs to revegetate with forage seed and transplant trees at the entrance, providing a more effective barrier to off-highway vehicle use. ...
  • Detroit Ranger District (Or.) (2003-05)
    Proposes to: a) issue a 20-25 year special use permit to the Oregon Department of Parks and Recreation to manage sites in the Detroit Lake State Park, Tumble Creek Point, and Mongold Day Use Area, b) approve a master plan ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics