Scappoose, Oregon Planning Documents
Permanent URI for this collection
Browse
Browsing Scappoose, Oregon Planning Documents by Author "Kittelson & Associates"
Now showing 1 - 1 of 1
Results Per Page
Sort Options
Item Open Access Scappoose : Rail corridor study(City of Scappoose (Or.), 2002-10) Scappoose (Or.); Kittelson & Associates; HDR EngineeringThis study provides a comprehensive review of higlway/rail grade crossing geometric and operational opportunities and constraints. These opportunities and constraints have been developed to address the needs of the City of Scappoose, PNWR, ODOT, and Columbia County. Through a six-month planning process, the community and its transportation service providers have crafted a preferred alternative with specific recommendations for each study grade crossing as well as several local access and circulation improvements. This final report provides the City, PNW, and ODOT with a framework for future reconstruction and development projects as well as a tool with which to leverage grants and other funding sources to complete the necessary infrastructure construction and reconstruction. [From the Plan]