Stayton, Oregon Planning Documents
Permanent URI for this collection
Browse
Browsing Stayton, Oregon Planning Documents by Author "Keller Associates"
Now showing 1 - 5 of 5
Results Per Page
Sort Options
Item Open Access Stayton : Storm water master plan (2008)(City of Stayton (Or.), 2008-05) Stayton (Or.); Keller AssociatesThe primary objectives of this Storm Water Master Plan are: establish storm system design and planning criteria; evaluate the existing storm system using computer hydraulic modeling; summarize existing system deficiencies and propose improvements to enhance system serviceability; recommend improvements needed to service future growth; develop a Capital Improvement Plan and an appropriate System Implementation Strategy. [From the Plan]Item Open Access Stayton : Wastewater treatment plant evaluation (2006)(City of Stayton (Or.), 2006-02) Stayton (Or.); Keller AssociatesThe purpose of this study is to provide an assessment of the existing SBR plant and to develop a master plan and capital improvement plan that address: compliance with existing and anticipated future NPDES permit limits; plant process performance and potential improvements; condition of existing facilities and equipment; staffing and O & M protocol; process monitoring procedures; development of future facility needs and capital improvement plan [From the document]Item Open Access Stayton : Water distribution facilities planning study (2006)(City of Stayton (Or.), 2006-01) Stayton (Or.); Keller AssociatesThis master plan evaluates the existing system and makes recommendations for improvements and upgrades necessary to accommodate future conditions and City objectives for water supply, distribution and storage. [From the plan]Item Open Access Stayton : Water management and conservation plan (2006)(City of Stayton (Or.), 2006-01) Stayton (Or.); Keller AssociatesOregon Administrative Rule 690-315 and 690-086 triggered the need to prepare a Water Management and Conservation Plan (WMCP). The WMCP has also been completed in conjunction with the update of the City’s water master plan. This is the first WMCP Stayton has submitted to the Oregon Water Resources Department (WRD). [From the Plan]Item Open Access Stayton : Water treatment plant analysis (2006)(City of Stayton (Or.), 2006-01) Stayton (Or.); Keller AssociatesThe purpose of this study is to provide an assessment of the existing water treatment plant and to develop a master plan and capital improvement plan. [From the document]