Tigard, Oregon Planning Documents
Permanent URI for this collection
Browse
Browsing Tigard, Oregon Planning Documents by Author "DKS Associates"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
Item Open Access Tigard : 99W improvement and management plan(City of Tigard (Or.), 2007-07) DKS Associates; ECO Northwest, Ltd.; Otak, Inc.; Tigard (Or.); Oregon Transportation and Growth Management ProgramThe recommended plan was developed through a planning process of four key steps supported by a public and agency involvement effort. The planning steps were: establish inventory of existing conditions; analyze needs, opportunities and constraints; develop alternative improvement concepts; compare and evaluate alternative concepts. [From the Plan]Item Open Access Tigard : Transportation system plan(City of Tigard (Or.), 2002-01-30) Tigard (Or.); DKS AssociatesThese goals and policies have been developed to guide the CityĆ¢ s twenty year vision of transportation system needs. They are intended to replace the current transportation related goals and policies in the Tigard Comprehensive Plan (these can be found in the appendix of this report). Additionally, they build upon material developed in the visioning process from January, 1998. State Transportation Planning Rule, Metro Functional Plan guidelines and the past comprehensive plan call for a more comprehensive and balanced approach to transportation policy, addressing walking, bicycling, transit, rail, truck and other modes as well as automobile travel. [From the Plan]