La Grande Ranger District
Permanent URI for this collection
Browse
Browsing La Grande Ranger District by Author "Wallowa-Whitman National Forest (Agency : U.S.)"
Now showing 1 - 3 of 3
Results Per Page
Sort Options
Item Open Access Sugar vegetation management project environmental assessment(2008-11) Wallowa-Whitman National Forest (Agency : U.S.)Proposes several alternatives for project initiating tree thinning, fuel reduction, and rehabilitation work, including placing large wood into Five Points Creek.Item Open Access Upper Grande Ronde mine tailings restoration project environmental assessment(2009-01) Wallowa-Whitman National Forest (Agency : U.S.)The Upper Grande Ronde Mine Tailings Restoration Project would remove and/or redistribute mine tailings as far away from the wetted edge of the upper Grande Ronde River as possible. A total of 18 sites would have mine tailings removed or redistributed for an approximate total of 46,964 yards. All of these sites are located within the floodplain of the upper Grande Ronde River (approx. 2.5 stream miles) and East Fork Grande Ronde River (approx. 25 mile). Wood would be placed within the entire 4.7 miles of the upper Grande Ronde River. Two roads and two dispersed sites would be obliterated. Six other dispersed sites would continue to provide recreation, but would have defined access points through strategic boulder placement. Seeding and planting would occur through out the entire project area.Item Open Access Upper Grande Ronde Watershed analysis(2004) Wallowa-Whitman National Forest (Agency : U.S.)Analyzes the watershed and its twelve subwatersheds to facilitate planing, implementation, and evaluation of forest management activities. Identifies existing conditions and provides an analytical framework and integration of the conditions and processes of the ecosystem elements. Lists elements out of balance with the analysis area, and identifies opportunities to return balance to the area subsequently pursued in the analysis.