Willamette National Forest
Permanent URI for this community
Browse
Browsing Willamette National Forest by Issue Date
Now showing 1 - 20 of 93
Results Per Page
Sort Options
Item Open Access Portland General Electric special use permit environmental assessment(2008-11) Willamette National Forest (Agency : U.S.)Proposes to authorize the following in a 20-year Special Use Permit: On the ONF-CRNG, MHNF, and WNF, a ROW that authorizes 1) continued operation and maintenance of the transmission line facilities; 2) routine vegetation management within the ROW; and 3) use and maintenance of service or access roads within the ROW. A special use authorization on the three National Forests that authorizes 1) management of danger trees outside the ROW; and 2) use and maintenance of transmission line service and access roads outside the ROW.Item Open Access Park Smith thin decision notice and finding of no significant impact(2008-09-19) Willamette National Forest (Agency : U.S.)Announces decision selecting Alternative 3, thinning the stands with a focus on accelerating the development of late successional stand characteristics in critical habitat for the northern spotted owl and increasing time between harvest entries. With this modification, Alternative 3 commercially thins about 1272 acres of 30-60 year-old, even-aged managed stands in the Park/Lost Lake, Hackleman and Smith subwatersheds to increase growth and vigor of residual trees; accelerate development of structural and compositional diversity.Item Open Access Ball Park thin project decision notice and finding of no significant impact(2008-09-05) Willamette National Forest (Agency : U.S.)Approves project implementing timber harvest on 915 acres for a gross estimate of 12.3 million board feet (MMBF) of Forest products. Natural fuels underburning will occur within two units on approximately 49 acres with three acres of reserves within the units.Item Open Access Traverse Creek thin project environmental assessment(2008-09) Willamette National Forest (Agency : U.S.)Proposes to thin area of over 2,900 acres of dense, even-aged, uniform, single-story, 35- to 60-year old plantations. This alternative is expected to yield approximately 40 million board feet of timber sawlogs to meet the purpose and need of maintaining the growth and health of the stands and producing a sustainable, commercial yield of wood products. The alternative uses a combination of ground-based, skyline and helicopter log-yarding systems with an emphasis on minimizing residual damage and disturbance.Item Open Access French Bug timber sale decision notice and finding of no significant impact(2008-09) Willamette National Forest (Agency : U.S.)Announces decision to select Alternative 3 to implement timber harvest on approximately 1276 acres of densely stocked, previously managed stands within the French Bug project area. This alternative will include commercial thinning on roughly 1264 acres, 1/2-acre gaps on 21 acres (15 acres within the thinning stands and 6 acres within the gap only stands), and larger gaps (1-3 acres) on 30 acres (22 acres within the thinning stands and 6 acres within the gap only stands). Total volume of commercial timber harvested is expected to be 15.1 million board feet (MMBF). Also includes maintenance and construction of roads.Item Open Access Park Smith thin environmental assessment(2008-08) Willamette National Forest (Agency : U.S.)Proposes that about 1291 acres of 30-60 year-old, managed stands would be commercially thinned and various measures would be taken to encourage species diversity and improve stand complexity.Item Open Access French Bug timber sale environmental assessment(2008-07) Willamette National Forest (Agency : U.S.)Proposes harvesting 1255 of 2200 acres of stands. Approximately 945 acres would remain untreated. Also includes maintenance and construction of roads.Item Open Access Ball Park thin project environmental assessment(2008-07) Willamette National Forest (Agency : U.S.)Proposes to respond to the purpose and need by implementing timber harvest on 915 acres for a gross estimate of 12.3 million board feet (MMBF) of Forest products. Natural fuels underburning will occur within two units on approximately 49 acres with three acres of reserves within the units.Item Open Access Research vegetation control environmental assessment(2008-07) Willamette National Forest (Agency : U.S.)The McKenzie River Ranger District (MRRD) on the Willamette National Forest (WNF) proposes to treat competing vegetation occupying research plots on approximately 5416 m2 with glyphosate. This treatment may occur at a yearly frequency for the next 10 years. The purpose of the project is to effectively remove vegetation interfering with the objectives of the research proposals. This action is tiered to the Willamette National Forest Invasive Plant EA (2007) and to direction provided in the Pacific Northwest Region Invasive Plant Program, Preventing and Managing Invasive Plants Record of Decision (USDA Forest Service 2005a). The proposed action includes manual and/or herbicide treatment methods.Item Open Access Bridge thin project decision notice and finding of no significant impact(2008-04-18) McKenzie River Ranger District (Or.)Announces decision to implement Alternative B of the project EA, to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The objectives would be to restore structural diversity in stem exclusion stands to enhance wildlife habitat, accelerate restoration of late-successional conditions for stands within riparian reserves, provide a sustainable supply of wood in support of the local and regional economy, restore "open oak savannah" stands where they were historically present, restore degraded roads infrastructure, improve the role of fire as a natural disturbance process in the ecosystem, and protect and maintain water quality and reduce hazardous fuel levels in the watershed for commodities in the wildland-urban interfaces.Item Open Access Niner project decision notice and finding of no significant impact for Units 15, 15A, 15C, and 16(2008-03-28) Middle Fork Ranger District (Or.)Announces decision to implement commercial thinning of Units #15, 15A, 15C, and 16 of Alternative A of the project EA, which was deferred in the previous decision notice owing to ongoing litigation involving survey requirements and management of rare and uncommon species on federal lands. The remaining four units will be thinned, yielding about 1.4 MMBF using the same combination of log yarding systems with an emphasis towards low cost ground-based yarding systems.Item Open Access Bridge thin project environmental assessment(2008-03) McKenzie River Ranger District (Or.)Proposes to thin 2463 acres, yielding a gross estimate of 47.8 million board feet of wood products that would be sold over 3 years beginning in fiscal year 2008. The objectives would be to restore structural diversity in stem exclusion stands to enhance wildlife habitat, accelerate restoration of late-successional conditions for stands within riparian reserves, provide a sustainable supply of wood in support of the local and regional economy, restore "open oak savannah" stands where they were historically present, restore degraded roads infrastructure, improve the role of fire as a natural disturbance process in the ecosystem, and protect and maintain water quality and reduce hazardous fuel levels in the watershed for communities in the wildland-urban interfaces.Item Open Access Santiam Pass summer motorized recreation project environmental assessment(2007-12) McKenzie River Ranger District (Or.)Proposes to develop and implement formal management of OHV use within the Santiam Wagon Road and Sand Mountain Special Interest Areas, the Big Lake Campground Complex, and the Hoodoo Ski Area. Includes designating a system of roads and trails for motorized recreation vehicle use, rehabilitating existing motorized recreation vehicle-impacts to the Santiam Wagon Road, and providing family-oriented recreation experiences.Item Open Access Recreation residence special use permit renewal decision memo(2007-11-08) Willamette National Forest (Agency : U.S.)Announces decision to reauthorize the special use permits for 247 summer residences for a period of 20 years with no terms and conditions in addition to those currently in the permits.Item Open Access Hehe LSR Thin Decision Notice and Finding of No Significant Impact(2007-10-31) Willamette National Forest (Agency : U.S.)Announces decision to implement Alternative 3 of the project EA to thin commercially about 3,762 acres of 35-60 year-old second-growth stands to accelerate the development of late-successional forest conditions and habitat structure. Includes maintenance and reconstruction of existing roads, construction of temporary roads, fuel treatments, and funding for various wildlife habitat enhancements.Item Open Access Hehe LSR thin project decision notice and finding of no significant impact(2007-10-31) Middle Fork Ranger District (Or.)Announces decision to implement Alternative 3 of the project EA, to thin commercially about 3762 acres of 35-60 year-old second-growth stands to accelerate the development of late-successional forest conditions and habitat structure. Includes maintenance and reconstruction of existing roads and possible construction of temporary roads, fuel treatments, and funding for various wildlife habitat enhancements.Item Open Access Presley's Twin project decision notice and finding of no significant impact(2007-10) Detroit Ranger District (Or.)Announces decision to implement Alternative 2 to begin harvesting timber (including thinning, shelterwood, and regeneration harvest) on about 1668 acres. Includes reopening of 3.5 miles of temporary spur roads and maintenance of 28.76 miles of existing system roads.Item Open Access Huckleberry Flats OHV Trail Expansion Decision Notice and Finding of No Significant Impact(2007-08-31) Willamette National Forest (Agency : U.S.)Announces decision to implement Alternative 1 of project EA, to increase the existing OHV trail system by approximately 30 miles to 63 miles, including a trail segment that will provide an alternative route to a mixed-use road where higher vehicle speeds may occur as well as other connecting segments. A Nonsignificant Forest Plan Amendment is included in the Proposed Action, which would 1) change the designation of the Huckleberry BGEA (Big Game Emphasis Area) from Medium Emphasis to Low Emphasis and 2) change the designation of the adjoining South Christy BGEA from Medium Emphasis to High Emphasis to increase the quantity of habitat management there to compensate for the reduction in the Huckleberry area.Item Open Access Echo Staley Road Storage and Illegal Household Trash Site Management Decision Notice and Finding of No Significant Impact(2007-07-02) Willamette National Forest (Agency : U.S.)Announces decision to implement Alternative 2 of project EA, to close up to 23 miles of roads in the Echo, Staley, Simpson, and Noisy Creek drainages within the Upper Middle Fork watershed to motorized traffic, and place about 21 miles of these roads into maintenance storage condition for 10 or more years. Also agrees to close up to 33 miles of road and two dispersed sites within the Middle Fork Willamette River/Lookout Point, North Fork of Middle Fork Willamette River, and Salmon Creek watersheds year-round or seasonally with boulders or gates to reduce illegal household trash dumping.Item Open Access Presley's Twin Project Environmental Assessment(2007-07) Detroit Ranger District (Or.)Proposes to harvest timber on 1668 acres, yielding about 19 million board feet. Includes about 834 acres of final shelterboard (overstory) removal, 52 acres of shelterboard creation, 3 acres of clearcut with reserves, 633 acres commercial thinning to 50 to 70% canopy closure and about 146 acres post and pole harvesting. Also includes road maintenance on 28.76 miles of road, and 4.1 miles of temporary road work.