Forest-wide Documents

Permanent URI for this collection

Browse

Recent Submissions

Now showing 1 - 2 of 2
  • ItemOpen Access
    Allison Guard Station improvement project environmental assessment, decision notice, and finding of no significant impact
    (2004-10-05) Malheur National Forest (Agency : U.S.)
    Environmental assessment proposes to improve Guard Station built by Civilian Conservation Corps, planning to 1) convert an existing warehouse/bunkhouse into more bunkhouse space, 2) reconstruct building foundations that are deteriorating, 3) construct a new vehicle storage shed in a manner that is consistent with the site’s historic character, 4) remove or modify the generator building and move the generator to the vehicle shed, 5) replace and upgrade an above ground fuel tank to meet spill standards and fire codes, 6) improve access to the cookhouse to meet Americans with Disabilities Act requirements (ADA) and 7) improve the water system by fixing the current spring box or drilling a well. Decision Notice announces implementation of the project, which will meet requirements for possible inclusion in the National Register of Historic Places.
  • ItemOpen Access
    Blue Mountain land exchange -- Oregon final environmental impact statement
    (2006-09) Malheur National Forest (Agency : U.S.); Umatilla National Forest (Agency : U.S.); Wallowa-Whitman National Forest (Agency : U.S.)
    Analyzes proposed assembled land exchange between Clearwater Land Exchange-Oregon and the Forest Service, involving acquiring and conveying within the Malheur, Umatilla, and Wallowa-Whitman National Forests. Plans to provide for more efficient cost effective management of Forest lands through consolidation, and to acquire and protect habitat for Threatened and Endangered species and lands within Congressionally Designated Areas. Concerns include exercise of American Indian treaty rights and cultural uses, water quality, fisheries, old growth associated species, and social and economic environment.