North Berry Creek unilateral right-of-way and road construction permit finding of no significant impact
Loading...
Date
2008-01
Authors
United States. Bureau of Land Management. Roseburg District Office
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Determines no environmental impact statement is needed for project proposing construction of an extension to BLM Road No. 29-7-7.0 in Section 7, T. 29 S., R. 7 W. The road extension, approximately 675 feet in length, would be temporary and unsurfaced, and located primarily on a ridge top location. Approximately 440 feet of construction would be located on BLM-managed lands, as the proposed road route crosses back and forth at three locations along the property line between BLM lands and the Delores P. Loftin Trust lands that are to be logged. This action would be authorized under an O&C Right-of-Way Permit. BLM timber cut in association with the road construction would be purchased by Swanson Group, LLC through a negotiated timber sale.
Description
4 pp. Section 7, T 29 S, R 7 W. Captured January 28, 2008.
Keywords
Right of way -- Oregon -- Roseburg Region, Public lands -- Oregon -- Roseburg Region, Forest roads -- Oregon -- Design and construction