Metro : Highway 217 corridor study (2004)

dc.contributor.authorMetro (Or.)
dc.date.accessioned2009-05-26T22:34:13Z
dc.date.available2009-05-26T22:34:13Z
dc.date.issued2004-11-03
dc.description19 pp. Bookmarks supplied by UO. Charts, tables, figures. Published November 3, 2004. Captured January 28, 2009.en_US
dc.description.abstractThe Highway 217 Corridor Study is being completed in two phases. The first phase developed and analyzed a wide range of multi-modal alternatives. Based on this evaluation, the alternatives will be refined to a smaller set that can be studied in more detail in the second phase. Options will be evaluated based on how well they address the study objectives in terms of travel performance, environmental and neighborhood effects, fi nancial feasibility, and cost effectiveness. [From the document]en_US
dc.identifier.urihttp://www.oregonmetro.gov/files/planning/217_report_11-03-04.pdf
dc.identifier.urihttps://hdl.handle.net/1794/9248
dc.language.isoen_USen_US
dc.publisherMetro (Or.)en_US
dc.subjectRegional planning -- Oregon -- Washington Countyen_US
dc.subjectTransportation -- Oregon -- Washington County -- Planningen_US
dc.subjectRoads -- Oregon -- Washington County -- Design and constructionen_US
dc.subjectTransportation -- Oregon -- Portland Metropolitan Area -- Planningen_US
dc.subjectOregon Route 217 (Or.)
dc.subjectRoute 217 (Or.)
dc.subjectBeaverton-Tigard Highway (Or.)
dc.subjectHighway 217 (Or.)
dc.subjectOR 217 (Or.)
dc.titleMetro : Highway 217 corridor study (2004)en_US
dc.title.alternativeHighway 217 corridor study : Phase I overview reporten_US
dc.typeBooken_US

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Metro_217_report_11-03-04.pdf
Size:
259.86 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Name:
license.txt
Size:
2.21 KB
Format:
Item-specific license agreed upon to submission
Description: