Metro : Highway 217 corridor study (2004)
dc.contributor.author | Metro (Or.) | |
dc.date.accessioned | 2009-05-26T22:34:13Z | |
dc.date.available | 2009-05-26T22:34:13Z | |
dc.date.issued | 2004-11-03 | |
dc.description | 19 pp. Bookmarks supplied by UO. Charts, tables, figures. Published November 3, 2004. Captured January 28, 2009. | en_US |
dc.description.abstract | The Highway 217 Corridor Study is being completed in two phases. The first phase developed and analyzed a wide range of multi-modal alternatives. Based on this evaluation, the alternatives will be refined to a smaller set that can be studied in more detail in the second phase. Options will be evaluated based on how well they address the study objectives in terms of travel performance, environmental and neighborhood effects, fi nancial feasibility, and cost effectiveness. [From the document] | en_US |
dc.identifier.uri | http://www.oregonmetro.gov/files/planning/217_report_11-03-04.pdf | |
dc.identifier.uri | https://hdl.handle.net/1794/9248 | |
dc.language.iso | en_US | en_US |
dc.publisher | Metro (Or.) | en_US |
dc.subject | Regional planning -- Oregon -- Washington County | en_US |
dc.subject | Transportation -- Oregon -- Washington County -- Planning | en_US |
dc.subject | Roads -- Oregon -- Washington County -- Design and construction | en_US |
dc.subject | Transportation -- Oregon -- Portland Metropolitan Area -- Planning | en_US |
dc.subject | Oregon Route 217 (Or.) | |
dc.subject | Route 217 (Or.) | |
dc.subject | Beaverton-Tigard Highway (Or.) | |
dc.subject | Highway 217 (Or.) | |
dc.subject | OR 217 (Or.) | |
dc.title | Metro : Highway 217 corridor study (2004) | en_US |
dc.title.alternative | Highway 217 corridor study : Phase I overview report | en_US |
dc.type | Book | en_US |