1610 Roadside treatment project final decision memo

Loading...
Thumbnail Image

Date

2009-03-16

Authors

Umpqua National Forest (Agency : U.S.)

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

Announces decision implementing roadside treatments by thinning, pruning, piling or chipping slash along the major roads (Forest Road 1610, 1610-050, 1610-100, 1610-500) within the lower Devil's Knob portion of the Elk Creek watershed. Trees and brush would be removed to bring the resulting condition to a Fuel Model 8 (an open stand with limited ground fuel) with low to moderate fuel loading resulting in healthier growing conditions for the stands. Treatment will occur alongside existing specified roads (generally 150' each side of road).

Description

13 pp. Tables. T. 30S, R. 1W, Sec. 35 and 36; T. 31S, R. 1W, Sec. 1, 2 and 11; T. 31S, R. 1E, Sec. 6 and 7. Captured March 18, 2009.

Keywords

Forest roads -- Oregon -- Umpqua National Forest, Fuel reduction (Wildfire prevention) -- Oregon -- Umpqua National Forest, Forest management -- Oregon -- Umpqua National Forest, Forest Road 1610 (Or.), Elk Creek Watershed (Douglas County, Or.)

Citation