1610 Roadside treatment project final decision memo
dc.contributor.author | Umpqua National Forest (Agency : U.S.) | |
dc.date.accessioned | 2009-03-23T22:37:33Z | |
dc.date.available | 2009-03-23T22:37:33Z | |
dc.date.issued | 2009-03-16 | |
dc.description | 13 pp. Tables. T. 30S, R. 1W, Sec. 35 and 36; T. 31S, R. 1W, Sec. 1, 2 and 11; T. 31S, R. 1E, Sec. 6 and 7. Captured March 18, 2009. | en |
dc.description.abstract | Announces decision implementing roadside treatments by thinning, pruning, piling or chipping slash along the major roads (Forest Road 1610, 1610-050, 1610-100, 1610-500) within the lower Devil's Knob portion of the Elk Creek watershed. Trees and brush would be removed to bring the resulting condition to a Fuel Model 8 (an open stand with limited ground fuel) with low to moderate fuel loading resulting in healthier growing conditions for the stands. Treatment will occur alongside existing specified roads (generally 150' each side of road). | en |
dc.identifier.uri | https://hdl.handle.net/1794/8843 | |
dc.language.iso | en_US | en |
dc.relation.ispartofseries | NEPA; | |
dc.subject | Forest roads -- Oregon -- Umpqua National Forest | en |
dc.subject | Fuel reduction (Wildfire prevention) -- Oregon -- Umpqua National Forest | en |
dc.subject | Forest management -- Oregon -- Umpqua National Forest | en |
dc.subject | Forest Road 1610 (Or.) | en |
dc.subject | Elk Creek Watershed (Douglas County, Or.) | en |
dc.title | 1610 Roadside treatment project final decision memo | en |
dc.title.alternative | Final decision memo: 1610 Roadside treatment project | en |
dc.type | Other | en |