Veneta : Total maximum daily load (TMDL) implementation plan

Loading...
Thumbnail Image

Date

2008-02-11

Authors

Veneta (Or.)

Journal Title

Journal ISSN

Volume Title

Publisher

City of Veneta (Or.)

Abstract

This document is the total maximum daily load (TMDL) Implementation Plan for the City of Veneta. This Plan describes the strategies that the City will implement to reduce temperature, bacteria, and mercury pollution in the Upper Willamette subbasin of the Willamette River. Implementation Plans from designated management agencies (DMAs), such as the City of Veneta, are required to comply with the Willamette Basin TMDL order and to help meet pollutant load allocations for the Upper Willamette subbasin as approved by the US Environmental Protection Agency (EPA) in September 2006. [From the Plan]

Description

34 pp. Bookmarks supplied by UO. Maps, tables, figures. Adopted February 11, 2008. Captured November 13, 2008.

Keywords

Environmental analysis, Natural resources -- Oregon -- Veneta, Land use -- Oregon -- Veneta -- Planning, City planning -- Oregon -- Veneta

Citation