Trail Bridge Recreation Area Master Plan
Loading...
Date
2012-12
Authors
University of Oregon. Dept. of Planning, Public Policy and Management. Community Planning Workshop
Journal Title
Journal ISSN
Volume Title
Publisher
University of Oregon
Abstract
The Eugene Water and Electric Board (EWEB) contracted
with the Community Planning Workshop (CPW) to create
the Trail Bridge Recreation Area Master Plan. This Master Plan document provides a guiding vision for
TB-RA improvements and redevelopment that is sustainable
and cost effective, playing on the site’s existing infrastructure
and assets. Simultaneously, the recommendations in this
document meet the requirements of the FERC relicensing
agreement. This document presents (1) a description of the
project’s context (2) a description of the design methodologies
and inputs, including FERC requirements and specific existing
site conditions; (3) a set of design principles used to guide
the master plan design process; (4) a site improvement
Master Plan and recommendations; and (5) appendices with
supplementary information to inform subsequent stages of the
design process.
Description
41 pages
Keywords
Community development, Land use planning, Trail Bridge Recreation Area Master Plan, Community Planning Workshop, Community Service Center, Willamette Valley, Eugene Water & Electric Board, FERC Project #2242, Federal Energy Regulatory Commissions Settlement Agreement, Carmen-Smith Hydroelectric Project (FERC Project #2242)