Madras fiber optic line project (phase 2) environmental assessment

dc.contributor.authorCrooked River National Grassland (Or.)
dc.date.accessioned2008-08-20T21:50:20Z
dc.date.available2008-08-20T21:50:20Z
dc.date.issued2003-03-26
dc.description35 pp. Maps, table, references. The fiber optic project begins in T. 11 S., R. 14 E., and ends at the T13S/T14S boundary. Captured May 30, 2007.en
dc.description.abstractProposes installation of a new fiber optic line, primarily on existing poles, within the existing right-of-way for the Central Electric Cooperative, Inc. (CEC) power transmission line. Designed to complement the earlier phase in providing broadband access to rural areas while causing the least ground disturbances, the project includes manually hanging fiber cable on 18 miles of existing CEC overhead poles with brackets, replacing two decaying wooden poles, and supplying weed-free grass and herb seed with which to cover replacement pole locations.en
dc.format.extent1346197 bytes
dc.format.mimetypeapplication/pdf
dc.identifier.urihttps://hdl.handle.net/1794/7201
dc.language.isoen_USen
dc.relation.ispartofseriesNEPAen
dc.subjectForest management -- Oregon -- Ochoco National Foresten
dc.subjectTelecommunication -- Oregon -- Ochoco National Foresten
dc.titleMadras fiber optic line project (phase 2) environmental assessmenten
dc.title.alternativeEnvironmental assessment: Madras fiber optic line project (phase 2)en
dc.typeOtheren

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Madras_Fiber_Optic_Line_Phase_2_EA.pdf
Size:
1.28 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Name:
license.txt
Size:
2.21 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections