Metro : Trolley Trail master plan (2004)
Loading...
Date
2004-01
Authors
Metro (Or.)
North Clackamas Parks & Recreation District
Metro (Or.). Regional Parks and Greenspaces Dept.
Adolfson Associates
JD White (Firm)
Journal Title
Journal ISSN
Volume Title
Publisher
Metro (Or.)
Abstract
The proposed Trolley Trail will run along a historic corridor once used by a streetcar
line that operated between Portland and Oregon City.... acquired a 6-mile stretch of the historic rail corridor between downtown Milwaukie
and Gladstone. The trail connects with existing bike lanes in Milwaukie and
Gladstone and will complete an essential link in Metro's Regional Trail System.
When completed, the Trolley Trail and connecting trails will create a continuous 20-
mile loop connecting Portland, Milwaukie, Gladstone, Oregon City and Gresham. [From the Plan]
Description
147 pp. Bookmarks supplied by UO. Maps, charts, tables, figures, illus., appendices. Published January, 2004. Captured January 28, 2009.
Keywords
Transportation -- Oregon -- Portland Metropolitan Area -- Planning, Bicycle trails -- Oregon -- Portland Metropolitan Area -- Planning, Pedestrian areas -- Oregon -- Portland Metropolitan Area -- Planning, Regional planning -- Oregon -- Clackamas County, Transportation -- Oregon -- Clackamas County -- Planning