Browsing by Subject "Public lands -- Oregon -- Roseburg Region"

Navigation

Display Options

Results

  • United States. Bureau of Land Management. Roseburg District Office (1998-09-22)
    Proposes to harvest some 4.3 million board feet of timber on approximately 135 acres in the Little River Watershed. Includes temporary road construction and improvement, and prescribed burning of slash.
  • United States. Bureau of Land Management. Roseburg District Office (2008-05)
    Proposes to create and maintain important fish habitat characteristics by placing a total of 25 logs into four sites along a 600-foot section of the Creek.
  • United States. Bureau of Land Management. Roseburg District Office (2002-06-21)
    Announces decision to authorize the replacement of a large stream-crossing culvert on the E. Fork Stouts Creek, located on BLM Road No. 31-3-10.1, immediately upstream of the junction with Road No. 31-3-3.2. Field Office ...
  • United States. Bureau of Land Management. Roseburg District Office (2005-01-03)
    Announces decision to authorize the implementation of the Proposed Action replacing stream crossing culverts on four sites within the Elk Creek fifth-field watershed.
  • United States. Bureau of Land Management. Roseburg District Office (2005-05-13)
    Proposes to replace four stream crossings in the Elk Creek fifth-field watershed by excavating the fill material from around the old culvert, removing the culvert, and replacing it with a round pipe or bottomless pipe on ...
  • United States. Bureau of Land Management. Roseburg District Office (2008-03-12)
    Proposes commercial thinning and density management of approximately 1,160 acres of mid-seral forest stands, 37-54 years old, in four separate proposed timber sales: Adams Apple (333 acres), Cedar Shingle (525 acres), Lurch ...
  • United States. Bureau of Land Management. Roseburg District Office (2007-05-23)
    Determines no environmental impact statement is needed for project occurring on two Bureau of Land Management roads; the Hubbard Creek Road (26-7-19.1) and the Long Ranch Road (26-3-20.3) located in Upper Umpqua Fifth-Field ...
  • United States. Bureau of Land Management. Roseburg District Office (2007-06-11)
    Announces decision to authorize the implementation of the Proposed Action Alternative as described in the Engineering Improvement and Realignment Environmental Assessment. The Engineering Improvement and Realignment will ...
  • United States. Bureau of Land Management. Roseburg District Office (2007-05-11)
    Proposes to repair and realign the Hubbard Creek and Long Ranch roads. Hubbard Creek Road repair includes removing some timber and having culverts and turn-outs added at appropriate locations. Long Ranch Road repair includes ...
  • United States. Bureau of Land Management. Roseburg District Office (1998-08-17)
    Announces decision to implement Alternative #3 (Multiple Entry Commercial Thinning) which the EA identified as the proposed action. The proposed action involves the commercial thinning harvest of young (second growth) ...
  • United States. Bureau of Land Management. Roseburg District Office (1998-08-17)
    Proposes to harvest 4.3 million board feet of timber on 8 units for approximately 387 acres of commercial thinning in the Middle Smith Watershed. Also includes road construction, road renovation and improvement, road ...
  • United States. Bureau of Land Management. Roseburg District Office (2007-06-12)
    Determines no environmental impact statement is needed for project of reciprocal right-of-way agreement that would permit Fruit Growers Supply Company (Fruit Growers) to use the 29-4-31.0, 30-5-31.0, 29-6-21.0, and 29-6-22.0 ...
  • United States. Bureau of Land Management. Roseburg District Office (2007-06-13)
    Proposes to grant Fruit Growers Supply Company's (Fruit Growers) request to the Bureau of Land Management (BLM) to enter into a new Reciprocal Right-of-Way Agreement for accessing three parcels of land under their ownership ...
  • United States. Bureau of Land Management. Roseburg District Office (2008-03-10)
    Announces decision to amend O&C Logging Road Right-of-Way Permit R-1204B (Permit), and Reciprocal Right-of-Way and Road Use Agreement R-1204B (Agreement) with Fruit Growers Supply Company in lieu of issuing a new agreement ...
  • United States. Bureau of Land Management. Roseburg District Office (2001-05-12)
    Proposes to do a commercial thinning harvest on approximately 226 acres of second growth forest in the Calapooya Watershed. Includes .6 million board feet from the Timothy Ridge commercial thinning and approximately 1.6 ...
  • United States. Bureau of Land Management. Roseburg District Office (2002-11-04)
    Proposes to do a commercial thinning harvest on approximately 321 acres on eight units of second growth forest located in the Rock Creek Watershed. Includes skyline cable and helicopter logging, and road construction and ...
  • United States. Bureau of Land Management. Roseburg District Office (2002-05-17)
    Proposes to do a commercial thinning harvest on approximately 330 acres on seven units of second growth forest located in the Elk Creek Watershed. Includes skyline cable and ground-based logging and temporary road construction.
  • United States. Bureau of Land Management. Roseburg District Office (2003-05-22)
    Proposes to do a commercial thinning harvest on 1170 acres on 17 units, with cable, helicopter, and ground-based logging of second growth forest located in the Calapooya, Lower North Umpqua, and Elk Creek Watersheds. ...
  • United States. Bureau of Land Management. Roseburg District Office (2004-03-31)
    Determines no environmental impact statement is needed for project initiating commercial thinning harvest and density management of young growth timber in the Upper Umpqua Watershed.
  • United States. Bureau of Land Management. Roseburg District Office (2003-10-30)
    Proposes to do a commercial thinning harvest of 4.6 million board feet on approximately 450 acres of second-growth forest in the Upper Umpqua Watershed. Also includes new road construction and renovation or improvement of ...

Search Scholars' Bank

Browse

My Account

Statistics