Abstract:
The Eugene Water and Electric Board (EWEB) contracted with the Community Planning Workshop (CPW) to create the Trail Bridge Recreation Area Master Plan. The Trail Bridge Recreation Area (TB-RA) currently functions as a campground and day-use site within the Willamette National Forest, approximately 65 miles east of Eugene, Oregon. Infrastructure within the site was originally constructed in the 1960s and is in need of upgrading to meet the current standards for recreation design, universal accessibility requirements, and the changing preferences of the visitors. This Master Plan document provides a guiding vision for the TB-RA improvements and redevelopment that is sustainable and cost-effective, playing on the site's existing infrastructure and assets.