Browsing Transportation plans by Title

Navigation

Display Options

Results

  • Waldport (Or.); TriLand Design Group; Kittelson & Associates; Macdonald Environmental Planning (Firm) (City of Waldport (Or.), 1999-06-09)
    The City of Waldport has received a State of Oregon grant to prepare a Transportation System Plan (TSP). The Plan will result in a plan to satisfy the community's transportation needs and desires for the 20 year ...
  • Wallowa (Or.); David Evans and Associates (City of Wallowa (Or.), 2001-03)
    The Wallowa Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the transportation ...
  • Warrenton Trails Association; Warrenton (Or.); Resource Assistance for Rural Environments (Program); RARE (City of Warrenton (Or.), 2007-07-07)
    The goal of the Warrenton Trails master Plan is to create a comprehensive network of trails that links destinations, natural features, historic landmarks, community facilities, other transportation facilities, neighborhoods, ...
  • Warrenton (Or.); Angelo Eaton & Associates; CH2M Hill, inc. (City of Warrenton (Or.), 2004-02)
    The City of Warrenton, in conjunction with the Oregon Department of Transportation (ODOT), initiated a study of the City's transportation system in 2002. The Warrenton Comprehensive Plan is currently undergoing periodic ...
  • West Linn (Or.) (City of West Linn (Or.), 2000)
    The Transportation System Plan for West Linn proposes that the City have a balanced, integrated transportation system which promotes ease of use for car drivers, pedestrians, bicyclists, and transit users. All except ...
  • DKS Associates; West Linn (Or.) (City of West Linn (Or.), 2008-10)
    In 2000, the City of West Linn adopted their first Transportation System Plan (TSP). Since that time, there has been significant growth in West Linn and its surrounding communities, and a few key changes to state highway ...
  • Oregon. Dept. of Transportation; DKS Associates; Tri-County Metropolitan Transportation District of Oregon; SERA Architects; Cogan Owens Cogan (Firm); West Linn (Or.); Metro (Or.) (City of West Linn (Or.), 2008-01-04)
    The purpose of this project was to develop a multi-modal Conceptual Design Plan for OR 43 that adequately accommodates bicycles, pedestrians, automobiles, and trucks. The final conceptual design strikes a balance between ...
  • Weston (Or.); David Evans and Associates; Umatilla County (Or.) (City of Weston (Or.), 2001-06)
    The City of Weston Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the ...
  • Wheeler (Or.); TriLand Design Group (City of Wheeler (Or.), 2001-06-19)
    The Wheeler TSP will address ways to improve the transportation system to support anticipated growth in Wheeler and associated traffic volumes in a way that will support the functioning of Highway 101 as a Statewide Highway. ...
  • Willamina (Or.) (City of Willamina (Or.), 1998-08)
    The Willamina TSP includes the following: transportation goals, policies, and objectives; a determination of transportation needs; a street plan for arterials and collectors and standards for the layout of local streets ...
  • Wilsonville (Or.); Alta Planning and Design (City of Wilsonville (Or.), 2006-12)
    Throughout the planning processes, the community expressed key priorities, including: improving access to and across the Willamette River; providing a comprehensive system of bikeways and walkways; developing a pool ...
  • Wilsonville (Or.); SMART Transit (City of Wilsonville (Or.), 2007-09)
    The Transit Plan locates key destinations within and outside of Wilsonville, in order to plan for the future of the multi-modal transit center. Both the Bicycle and Pedestrian Master Plan and the Transit Plan analyze the ...
  • Wilsonville (Or.); Entranco, Inc. (City of Wilsonville (Or.), 2003-06-02)
    This document (the Transportation Systems Plan) is a complete update of the City's 1991 Transportation Master Plan and constitutes the transportation element of the City's Comprehensive Plan. Transportation needs, including ...
  • Winston (Or.); Douglas County (Or.); Umpqua Regional Council of Governments; Oregon. Dept. of Transportation (Oregon Dept. of Transportation, 2004)
    This Access Management Strategy and Livability Plan (AMS & LP) has been developed in compliance with the Oregon Highway Plan (OHP), the City of Winston Transportation System Plan, and in response to a Oregon Transportation ...
  • Winston (Or.); Umpqua Regional Council of Governments (Winston (Or.), 2003-06-23)
    This Winston Transportation System Plan (TSP) is a summary of the past transportation planning efforts and current Comprehensive Plan Periodic Review program activities underway for the City of Winston. This report expands ...
  • Wood Village (Or.); Connell, Carole W. (City of Wood Village (Or.), 1999-05)
    The City of Wood Village began its first citywide transportation planning effort in 1998 after receiving a Transportation Growth Management grant from the Oregon Department of Transportation to complete the requirements ...
  • Woodburn (Or.); Kittelson & Associates (City of Woodburn (Or.), 1996-06)
    The plan has a planning horizon to the year 2015, and represents for the first time a comprehensive, multi-modal transportation plan to guide transportation investment in the City over the next 20 years. As an input ...
  • Woodburn (Or.); CH2M Hill, inc.; Kittelson & Associates (City of Woodburn (Or.), 2005-09)
    The city of Woodburn (City), in conjunction with the Oregon Department of Transportation (ODOT), initiated an update of the City's 1996 Transportation System Plan (TSP) in 2002. The City of Woodburn Comprehensive Plan ...
  • Woodburn (Or.); Oregon. Dept. of Transportation (Oregon Dept. of Transportation, 2005-11)
    The chief purpose of the IAMP is to: protect the function of the reconstructed interchange to serve statewide and regional travel through the 2025 planning horizon; minimize the probability of needing additional major ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics