Sisters couplet refinement plan

Show full item record

Title: Sisters couplet refinement plan
Author: Cogan Owens Cogan (Firm); Yakas, Robert; Sisters (Or.); CTS Engineers
Abstract: The couplet was identified in the Cityâ s Transportation System Plan (TSP), adopted in June 2001, as the preferred long-term solution to addressing future congestion. While it was not identified as a top priority project, it was preferred over other long-term options for addressing congestion. The couplet identified in the TSP is a non-traditional couplet in comparison to those implemented in most communities. [From the Plan]
Description: 60 pp. Appendices not included in this document, but "will be available in a separate volume". Revised November 2004. Captured January 19, 2006.
URI: http://hdl.handle.net/1794/2141
http://www.ci.sisters.or.us/downloads/crp.pdf
Date: 2004-11


Files in this item

Files Size Format View
Sisters_Couplet_Refinement_Plan.pdf 2.940Mb PDF View/Open

This item appears in the following Collection(s)

Show full item record