Washington County (Or.); Otak, Inc.
(Washington County (Or.), 2007-10-05)
The purpose of
the infrastructure plan is to:
describe the stormwater management strategy for North Bethany;
show how the strategy would be applied to the concept plan;
provide a cost estimate for the stormwater ...