United States. Bureau of Land Management. Prineville District
(2009-02-19)
Approves plan renewing the grazing lease for ten years.
-
United States. Bureau of Land Management. Prineville District
(2009-02-27)
Approves plan renewing the grazing lease for ten years.
-
United States. Bureau of Land Management. Burns District
(2006-11)
Proposes to release approximately 30 California bighorn sheep onto Pickett Rim, just west of Frenchglen, Oregon in December 2006. The sheep will be trapped out of the John Day River Basin and transported in horse trailers ...
-
United States. Bureau of Land Management. Burns District
(2006-11)
Announces decision to implement project to release approximately 30 California bighorn sheep onto Pickett Run, just west of Frenchglen in December 2006. The sheep would be trapped out of the John Day River Basin and ...
-
United States. Bureau of Land Management. Salem District
(2006-10)
Announces decision approving two projects. Project 1, the Pig's Puzzle Timber Sale, is a commercial thinning and regeneration harvest timber sale on 277 acres of federal lands in T4N R2W sections 29 and 31, and T4N R3W ...
-
United States. Bureau of Land Management. Salem District
(2006-07)
This EA Reissue covers two projects. Project 1, the Pig's Puzzle Timber Sale, is a commercial thinning and regeneration harvest timber sale on 277 acres of federal lands in T4N R2W sections 29 and 31, and T4N R3W section ...
-
United States. Bureau of Land Management. Prineville District
(2008-05-01)
Proposes to install a natural rock weir to stabilize the elevation of the steam channel and allow for fish passage. Includes installing the structure immediately downstream of the location where the exposed pipeline crosses ...
-
United States. Bureau of Land Management. Prineville District
(2008-06-20)
Finds no environmental impact statement is necessary for project installing a natural rock weir to stabilize the elevation of the stream channel and allow for fish passage. Includes installing the structure immediately ...
-
United States. Bureau of Land Management. Burns District
(2007-08)
Proposes to utilize a combination of prescribed burning and silvicultural methods to reduce the chance of sustained crown fire on 1200 acres of ponderosa pine dominated forest within the Craft Point and Pine Creek area.
-
United States. Bureau of Land Management. Burns District
(2007-08)
Announces decision to exclude EIS from project utilizing a combination of prescribed burning and silvicultural methods to reduce the chance of sustained crown fire on 1200 acres of ponderosa pine dominated forest within ...
-
United States. Bureau of Land Management. Coos Bay District
(2009-02-24)
Announces decision approving project implementing commercial thinning totaling 117 acres and density
management thinning totaling 53 acres in dense conifer stands. The Pink Panther CT Timber Sale will
require construction ...
-
United States. Bureau of Land Management. Salem District
(2008-09-16)
Excludes from further environmental scrutiny proposed action salvaging approximately 5.5 acres of approximately 80-year-old timber that was blown down during winter storms in 2006 and 2007. The project area is in T.4N, ...
-
United States. Bureau of Land Management. Salem District
(2008-09-16)
Announces decision to implement the project, authorizing salvage harvest of approximately 30 dead and down trees on approximately 5.5 acres of land. Harvest operations will be conducted with ground-based equipment from ...
-
United States. Bureau of Land Management. Lakeview District
(2007-11-13)
Announces decision to implement project providing the Lake County Road Department with a reliable source of mineral materials for use in routine road maintenance and construction work by expanding the existing pit to the ...
-
United States. Bureau of Land Management. Lakeview District
(2007-10-11)
Proposes to provide the Lake County Road Department with a reliable source of mineral materials for use in routine road maintenance and construction work by expanding the existing pit to the north and east by approximately ...
-
United States. Bureau of Land Management. Lakeview District
(2008-01-25)
Categorically excludes project seeking to capture the highest economic value of the dead and severely scorched and stressed trees prior to deterioration. Includes cutting and yarding on 115 acres, and selling 100-150 MBF ...
-
United States. Bureau of Land Management. Salem District
(2007-06-06)
Currently the NE 1/4 of Section 5, Township 13 South, Range 8 West., is included in ROW Agreement S-347. The remainder of Section 5 needs to be added to restore access between the North Fork Access Road #12-8-19 and Fall ...
-
United States. Bureau of Land Management. Salem District
(2005-06-08)
The applicant, Plum Creek Timber Company, has requested permanent access to their lands by amendment to R.W.A. S-347 (OR44513). Use of an existing BLM road #11-10-12 and construction of approximately 400-feet of ridge top ...
-
United States. Bureau of Land Management. Salem District
(2009-02-12)
Excludes from further environmental analysis amendment to right-of-way. The existing BLM managed land over which the
requested access occupies has not been included in RWA S-347 and their addition is
therefore discretionary. ...
-
United States. Bureau of Land Management. Lakeview District
(2008-03-13)
Categorically excludes project aiding deer and elk habitat by reducing the density of vegetation in 18 units totaling approximately 281 acres of brushfields using a combination of methods, including selective mastication ...