Now showing items 1-20 of 26

    • Bear Marten Watershed environmental assessment 

      United States. Bureau of Land Management. Eugene District (1998-02)
      The Introduction chapter consists of a general description of the watershed and watershed analysis. The Characterization chapter summarizes the current conditions of important resources in the watershed such as soils, ...
    • Camp Run timber sale finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2008-06-18)
      Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the proposed Camp Run Project (EA-OR090-07-06) was prepared by the Upper Willamette Resource Area, Eugene District of the Bureau of Land ...
    • ERFO roads finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-06-25)
      Announces implementation of repairing one road and decommissioning another damaged by storms. Includes restoring road surface, realigning road, installing crossdrains and culverts, removing about twelve trees, and revegetating ...
    • Upper Siuslaw landscape plan environmental assessment 

      United States. Bureau of Land Management. Eugene District (2008-12-10)
      Actions analyzed in this EA include density management and commercial thinning, riparian enhancement treatments, botanical restoration treatments, culvert replacements/removals, and road construction, renovation, ...
    • Hatchery Creek timber sale decision record 

      United States. Bureau of Land Management. Eugene District (2008-08-08)
      An Environmental Assessment (EA) and Finding of No Significant Impacts (FONSI) for the proposed McKenzie Tribs Projects (EA-OR090-08-01) were prepared by the Upper Willamette Resource Area, Eugene District of the Bureau ...
    • Clay and Whittaker Creek recreation sites decision record/categorical exclusion review 

      United States. Bureau of Land Management. Eugene District (2005-10-04)
      Announces approval of project replacing the existing vehicle barriers in the Clay and Whittaker recreation sites with newer one meeting safety standards regarding height requirement and correct placement.
    • Warner Roost finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-02-20)
      Announces implementation of Alternative 2 of project EA, accelerating the development of suitable nesting and roosting habitat for bald eagles by thinning uplands and riparian reserve areas on 350 acres, creating snag and ...
    • Shotgun OHV trail system modifications environmental assessment and finding of no significant impact 

      United States. Bureau of Land Management. Eugene District (2006-05-31)
      EA proposes to initiate a recreation management project to improve the Shotgun OHV trail system by (1) relocating, redesigning, or decommissioning portions of trails that are difficult to maintain or are causing excessive ...
    • Row River bridge decision record/categorical exclusion review 

      United States. Bureau of Land Management. Eugene District (2006-07-17)
      Announces decision to issue a right-of-way grant of approximately .15 acres to Lane County for the facilitation of replacing Row River Bridge.
    • Teeter Creek aquatic and riparian habitat restoration environmental assessment and finding of no significant impact 

      United States. Bureau of Land Management. Eugene District (2006-03-22)
      Proposes to restore and enhance the spatial and temporal connectivity and the physical integrity of the aquatic ecosystem by eliminating human-caused barriers and enhancing habitat complexity within the Teeter Creek Drainage. ...
    • Mohawk River timber sale finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-10-25)
      Announces decision implementing Alternative 2 of the Mohawk East project EA, providing a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat ...
    • Drury Bunks timber sale decision notice 

      United States. Bureau of Land Management. Eugene District (2008-02-25)
      Announces decision implementing Alternative 2 of project EA to proceed with Drury Bunks timber sale as part of plan to provide a sustainable supply of timber from the Matrix lands while maintaining valuable structural ...
    • Mohawk East project environmental assessment 

      United States. Bureau of Land Management. Eugene District (2007-12-10)
      Proposes to provide a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat for special status species, and treat stands to accelerate the ...
    • Salvage Sam blow down recovery environmental assessment 

      United States. Bureau of Land Management. Eugene District (2007-08)
      Proposes salvage activities on about 40 acres, removing 650 thousand board feet (MBF) of blow down timber removed via a timber sale.
    • West Eugene Wetlands schedule environmental assessment and finding of no significant impact 

      United States. Bureau of Land Management. Eugene District (2005-10)
      Proposes treatments on 1340 acres of BLM-managed lands in West Eugene Wetlands. Ten-year integrated treatment schedule aims to protect an integrated system of wetlands, protect and expand current populations and habitat ...
    • Upper Lake Creek special recreation management area recreation area management plan environmental assessment 

      United States. Bureau of Land Management. Eugene District (2005-01)
      Proposed preferred plan would emphasize development of rustic recreation facilities at Hult Reservoir and development of a non-motorized trail system in the SRMA. Facilities would include: an improved boat launch for ...
    • McKenzie Tribs environmental asssessment 

      United States. Bureau of Land Management. Eugene District (2007-11-13)
      Proposes to provide a sustainable supply of timber while maintaining valuable structural components (snags and down wood) and to provide habitat for a variety of organisms associated with both late-successional and younger ...
    • McGowan/Parsons project environmental assessment 

      United States. Bureau of Land Management. Eugene District (2006-05-03)
      Proposes to provide a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat for special status species, and to treat stands to accelerate the ...
    • McGowan/Parsons project finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-06-20)
      Announces decision to implement project providing a sustainable supply of timber from the Matrix lands while maintaining valuable structural components (snags and down woods) and habitat for special status species, and to ...
    • ERFO roads finding of no significant impact and decision record 

      United States. Bureau of Land Management. Eugene District (2007-06-25)
      Announces decision implementing project on two sites. Includes repairing the site of the fill failure on road 16-3E-34, restoring the road surface, realigning the road approximately eight feet, installing needed crossdrains ...