Browsing Forest Service by Title

Navigation

Display Options

Results

  • Detroit Ranger District (Or.) (2002-10-29)
    Announces decision to implement Alternative 4 eliminating the built-in mooring docks and the conceptual design changes in Alternative 5, converting and reconstructing the Upper Arm Recreation Site to a formal day-use site ...
  • Detroit Ranger District (Or.) (2002-06)
    Proposes to convert and reconstruct the Upper Arm Recreation Site to a formal day-use site with picnic, swimming, fishing, hiking, boat-in and interpretive facilities, while eliminating the five existing campsites. ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2006-08)
    Assesses mine site on moderately steep side slopes consisting of four collapsed adits and about 1500cy of wasterock. A Niton XLt unit found most metals detected at the site exceeded screening criteria for birds, invertebrates, ...
  • Pomeroy Ranger District (Or. and Wash.) (2000-04)
    Documents include draft environmental impact statement (DEIS) summary, response to comments, the abstract of the final environmental impact statement, an errata page with changes to the DEIS (all of which constitute the ...
  • Pomeroy Ranger District (Or. and Wash.) (2005-12)
    Contains documents including final supplemental environmental impact statement (FSEIS) abstract, public and agency letters with comments, Forest Service response to comments, errata, and draft supplemental environmental ...
  • Mt. Hood National Forest (Agency : U.S.) (2008-08-21)
    Announces decision initiating a commercial thinning project in plantations ranging in age from 42 to 56 years old. The proposed action is to thin and harvest wood fiber from approximately 1094 acres of matrix land, ...
  • Mt. Hood National Forest (Agency : U.S.) (2008)
    Proposes a commercial thinning project in plantations ranging in age from 42 to 56 years old. The proposed action is to thin and harvest wood fiber from approximately 1094 acres of matrix land, late-successional reserves ...
  • Deschutes National Forest (Agency : U.S.) (1996-07)
    Direction of the plan stems from extensive analysis and considerations documented in the FEIS, and is based on Alternative 6. Includes background, implementation and coordination, outstandingly remarkable values and special ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2009-01)
    The Upper Grande Ronde Mine Tailings Restoration Project would remove and/or redistribute mine tailings as far away from the wetted edge of the upper Grande Ronde River as possible. A total of 18 sites would have mine ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2004)
    Analyzes the watershed and its twelve subwatersheds to facilitate planing, implementation, and evaluation of forest management activities. Identifies existing conditions and provides an analytical framework and integration ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2004)
    Analyzes the watershed and its twelve subwatersheds to facilitate planing, implementation, and evaluation of forest management activities. Identifies existing conditions and provides an analytical framework and integration ...
  • Crescent Ranger District (Or.) (2002-12)
    Analyzes road conditions on the 80,375 acres of the watershed, in an area of unevenly distributed roads. Six-part process consists of: setting up the analysis, describing the situation, identifying the issues, assessing ...
  • McKenzie River Ranger District (Or.) (2007-06-14)
    Announces decision to implement Alternative 2 of the project EA, providing and maintaining opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and ...
  • McKenzie River Ranger District (Or.) (2007-02)
    Proposes to provide and maintain opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and reconstructing the existing launch at Paradise. Includes ...
  • McKenzie River Ranger District (Or.) (2004-02)
    Proposes supplementation of existing woody material to act as flow deflection and capture spawning gravels in the McKenzie River channel upstream of Trail Bridge Dam. Existing material would be supplemented with trees ...
  • Willamette National Forest (Agency : U.S.) (2007-03)
    Proposes to close and store approximately 24 miles of roads in the watershed to minimize adverse affects to the resources and improve ability to perform adequate road maintenance activities within the existing budgetary ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2005)
    Unfinished draft analyzes the watershed and its thirteen subwatersheds to facilitate planning, implementation, and evaluation of forest management activities. Examines issues, including vegetation and forest health, riparian ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2005)
    Unfinished draft analyzes the watershed and its thirteen subwatersheds to facilitate planning, implementation, and evaluation of forest management activities. Examines issues, including vegetation and forest health, riparian ...
  • Bend-Fort Rock Ranger District (Or.) (2003-05)
    Announces decision to categorically exclude project closing 5 user created roads adjacent to Newberry National Volcanic Monument. The approximately 1/4 mile of road, which leads to user created dispersed campsites along ...
  • Malheur National Forest (Agency : U.S.) (2008-08)
    Proposed project provides continued grazing while assuring that livestock management is consistent with the Malheur National Forest Plan and/or moves toward meeting aquatic and other resource Forest Plan standards, as ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics