Browsing Forest Service by Title

Navigation

Display Options

Results

  • Deschutes National Forest (Agency : U.S.) (1996-07)
    Direction of the plan stems from extensive analysis and considerations documented in the FEIS, and is based on Alternative 6. Includes background, implementation and coordination, outstandingly remarkable values and special ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2009-01)
    The Upper Grande Ronde Mine Tailings Restoration Project would remove and/or redistribute mine tailings as far away from the wetted edge of the upper Grande Ronde River as possible. A total of 18 sites would have mine ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2004)
    Analyzes the watershed and its twelve subwatersheds to facilitate planing, implementation, and evaluation of forest management activities. Identifies existing conditions and provides an analytical framework and integration ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2004)
    Analyzes the watershed and its twelve subwatersheds to facilitate planing, implementation, and evaluation of forest management activities. Identifies existing conditions and provides an analytical framework and integration ...
  • Crescent Ranger District (Or.) (2002-12)
    Analyzes road conditions on the 80,375 acres of the watershed, in an area of unevenly distributed roads. Six-part process consists of: setting up the analysis, describing the situation, identifying the issues, assessing ...
  • McKenzie River Ranger District (Or.) (2007-06-14)
    Announces decision to implement Alternative 2 of the project EA, providing and maintaining opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and ...
  • McKenzie River Ranger District (Or.) (2007-02)
    Proposes to provide and maintain opportunities for river-oriented recreation activities by relocating boat launches at Frissell and Bruckart launch sites, and reconstructing the existing launch at Paradise. Includes ...
  • McKenzie River Ranger District (Or.) (2004-02)
    Proposes supplementation of existing woody material to act as flow deflection and capture spawning gravels in the McKenzie River channel upstream of Trail Bridge Dam. Existing material would be supplemented with trees ...
  • Willamette National Forest (Agency : U.S.) (2007-03)
    Proposes to close and store approximately 24 miles of roads in the watershed to minimize adverse affects to the resources and improve ability to perform adequate road maintenance activities within the existing budgetary ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2005)
    Unfinished draft analyzes the watershed and its thirteen subwatersheds to facilitate planning, implementation, and evaluation of forest management activities. Examines issues, including vegetation and forest health, riparian ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2005)
    Unfinished draft analyzes the watershed and its thirteen subwatersheds to facilitate planning, implementation, and evaluation of forest management activities. Examines issues, including vegetation and forest health, riparian ...
  • Bend-Fort Rock Ranger District (Or.) (2003-05)
    Announces decision to categorically exclude project closing 5 user created roads adjacent to Newberry National Volcanic Monument. The approximately 1/4 mile of road, which leads to user created dispersed campsites along ...
  • Malheur National Forest (Agency : U.S.) (2008-08)
    Proposed project provides continued grazing while assuring that livestock management is consistent with the Malheur National Forest Plan and/or moves toward meeting aquatic and other resource Forest Plan standards, as ...
  • Willamette National Forest (Agency : U.S.) (2007-04-16)
    Announces decision to implement but modify Alternative 4 of project EA by having the Middle Fork District Ranger serve as the approving official on any administrative exceptions for motor boat use or use of internal ...
  • Willamette National Forest (Agency : U.S.) (2006-12)
    Proposes to alter recreational activities by restricting boat motor use on Waldo Lake to electric motors only, prohibit floatplanes, and prohibit public use of generators and chainsaws within the Dispersed Recreation ...
  • Deschutes National Forest (Agency : U.S.) (2009-02)
    Walker Mountain is a designated electronic site located on the Crescent Ranger District on the Deschutes National Forest. The Deschutes National Forest proposes to issue a special use permit to Bonneville Power Administration ...
  • Wallowa-Whitman National Forest (Agency : U.S.) (2003-10-21)
    Analysis identifies issues and assesses benefits, problems, and risks associated with the Forest's arterial and collector roads. Determines minimum road system for maintenance of level 3-5 roads, the number of roads necessary ...
  • Lookout Mountain Ranger District (Or.) (2006-12-19)
    Announces decision to categorically exclude and authorize the construction of a groomer shed approximately 30 by 60 feet, located between Roads 2200-135 and 2200-140 across from the Walton Sno-Park.
  • Bend-Fort Rock Ranger District (Or.) (2003-08)
    Announces decision to implement Alternative C of project EA, closing Skyliner Snooper area to snow play, and providing a new snow play area and shelter at Wanoga.
  • Bend-Fort Rock Ranger District (Or.) (2003-03)
    Proposes to construct a previously authorized 4-acre snow play hill with 3-5 runs cleared of vegetation, a warming shelter, a single vault toilet, a 100-vehicle parking area, and a 600-foot road access to Cascades Lakes ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics