Now showing items 21-37 of 37

    • Mt. Emily fuels reduction project environmental assessment and decision notice/FONSI 

      La Grande Ranger District (Or.) (2005-02-25)
      Environmental assessment reviews proposed activities designed to reduce fuels and associated fire behavior in the stands of timber adjacent to or within the wildland urban interface on Mt. Emily. Activities include ...
    • Mt. Emily fuels reduction project environmental assessment and decision notice/FONSI 

      La Grande Ranger District (Or.) (2005-02-25)
      Environmental assessment reviews proposed activities designed to reduce fuels and associated fire behavior in the stands of timber adjacent to or within the wildland urban interface on Mt. Emily. Activities include ...
    • Mt. Emily II fuels reduction project environmental assessment and decision notice/FONSI 

      La Grande Ranger District (Or.) (2006-04-06)
      Environmental assessment reviews proposed activities to respond to fire risks in the area deferred from the original Mt. Emily project within mapped lynx habitat, by modifying fuels and potential fire behavior on public ...
    • Mt. Emily II fuels reduction project environmental assessment and decision notice/FONSI 

      La Grande Ranger District (Or.) (2006-04-06)
      Environmental assessment reviews proposed activities to respond to fire risks in the area deferred from the original Mt. Emily project within mapped lynx habitat, by modifying fuels and potential fire behavior on public ...
    • New York Mine abbreviated preliminary assessment 

      Wallowa-Whitman National Forest (Agency : U.S.) (2006-08)
      Assesses mine site consisting of numerous trenches on the mountain slope, at least five of which are collapsed to partially collapsed adits, 9000-12,000cy of wasterock and 4000cy of tailings. A Niton XLt unit found all ...
    • North Fork John Day Wild and Scenic River management plan environmental assessment, decision notice and finding of no significant impact 

      North Fork John Day Ranger District (Or.); Baker Ranger District (Or.) (1993-06)
      Proposes to develop a management plan that will address resource protection, development of lands and facilities, user capacities, and other management practices necessary or desirable to achieve the purpose of the Act. ...
    • Pyx Mine and Mill abbreviated preliminary assessment 

      Wallowa-Whitman National Forest (Agency : U.S.) (2004-03)
      Assesses mine and mill site in moderate to steep side slopes, consisting of an open adit, waste rock dumps, tailings pond, and remains of a mill. A Niton XRF unit found numerous chemical elements exceeding regulations, ...
    • Rabbit Mine and Mill abbreviated preliminary asessment 

      Wallowa-Whitman National Forest (Agency : U.S.) (2004-03)
      Assesses mine and mill site on moderate to steep side slopes, with burned debris of the mill, open adit and an airshaft filled with water, with associated waste dumps. A Niton XRF unit found numerous chemical elements ...
    • Sled Springs OHV trail system and road management plan decision notice 

      Wallowa-Whitman National Forest (Agency : U.S.) (2008-11-26)
      Announces decision to implement Alternative 5 of project EA, to restrict motorized use in the Sled Springs area to designated routes. Upon establishment of the trail system, or implementation of the Forest-wide ...
    • Sled Springs OHV trail system and road management plan environmental assessment 

      Wallowa-Whitman National Forest (Agency : U.S.) (2008-11)
      Proposes to establish a 166-mile OHV trail system in the Sled Springs area. This OHV trail system would be for all-terrain vehicles and motorcycles. The proposal consists of converting 71 miles of existing roads into ...
    • Standard Mine abbreviated preliminary assessment 

      Wallowa-Whitman National Forest (Agency : U.S.) (2006-08)
      Assesses mine site on moderate side slopes, consisting of a large collapsed adit with minor seepage, approximately 500cy of wasterock near a small creek. A Niton XLt unit found that all metals exceeded screening criteria ...
    • Sugar vegetation management project environmental assessment 

      Wallowa-Whitman National Forest (Agency : U.S.) (2008-11)
      Proposes several alternatives for project initiating tree thinning, fuel reduction, and rehabilitation work, including placing large wood into Five Points Creek.
    • Upper Central Mine abbreviated preliminary assessment 

      Wallowa-Whitman National Forest (Agency : U.S.) (2006-08)
      Assesses mine site on moderately steep side slopes consisting of four collapsed adits and about 1500cy of wasterock. A Niton XLt unit found most metals detected at the site exceeded screening criteria for birds, invertebrates, ...
    • Upper Grande Ronde mine tailings restoration project environmental assessment 

      Wallowa-Whitman National Forest (Agency : U.S.) (2009-01)
      The Upper Grande Ronde Mine Tailings Restoration Project would remove and/or redistribute mine tailings as far away from the wetted edge of the upper Grande Ronde River as possible. A total of 18 sites would have mine ...
    • Upper Grande Ronde Watershed analysis 

      Wallowa-Whitman National Forest (Agency : U.S.) (2004)
      Analyzes the watershed and its twelve subwatersheds to facilitate planing, implementation, and evaluation of forest management activities. Identifies existing conditions and provides an analytical framework and integration ...
    • Upper Powder Watershed draft assessment 

      Wallowa-Whitman National Forest (Agency : U.S.) (2005)
      Unfinished draft analyzes the watershed and its thirteen subwatersheds to facilitate planning, implementation, and evaluation of forest management activities. Examines issues, including vegetation and forest health, riparian ...
    • Wallowa-Whitman National Forest forest roads analysis 

      Wallowa-Whitman National Forest (Agency : U.S.) (2003-10-21)
      Analysis identifies issues and assesses benefits, problems, and risks associated with the Forest's arterial and collector roads. Determines minimum road system for maintenance of level 3-5 roads, the number of roads necessary ...