Bonneville Power Administration (BPA) LaPine Substation communication tower decision memo

Show full item record

Title: Bonneville Power Administration (BPA) LaPine Substation communication tower decision memo
Author: Bend-Fort Rock Ranger District (Or.)
Abstract: Announces decision to issue a special use permit to BPA to construct a 140-foot communications tower within the existing BPA LaPine Substation. BPA will construct the tower and mount two microwave antennae onto the tower within the existing substation yard, operate and maintain it.
Description: 7 pp. Township 22 South, Range 11 East, Section 18. Captured January 15, 2008.
URI: http://hdl.handle.net/1794/6830
Date: 2007-06-25


Files in this item

Files Size Format View
BPA_LaPine_Subs ... ns_Tower_Decision_Memo.pdf 32.83Kb PDF View/Open

This item appears in the following Collection(s)

Show full item record