Metolius-Windigo Trail reconstruction decision memo

Show full item record

Title: Metolius-Windigo Trail reconstruction decision memo
Author: Bend-Fort Rock Ranger District (Or.); Sisters Ranger District (Or.)
Abstract: Announces decision to implement relocation of 8.6 miles and reconstruction of the remaining 61 miles of trail. Includes clearing brush and logs, defining tread, installing or maintaining drain drips and/or water bars, and minor relocation of trail where drainage structures fail to drain adequately water from the Trail.
Description: 6 pp. This project is located across 61 miles of the Bend Fort Rock and Sisters Ranger Districts from the Metolius River on the north to the Crescent-Bend Fort Rock District boundary on the south. The entire trail terminates on the south at Windigo Pass. See map. Captured May 18, 2007.
URI: http://hdl.handle.net/1794/6938
Date: 2004-01


Files in this item

Files Size Format View
Metolius-Windig ... truction_Decision_Memo.pdf 55.72Kb PDF View/Open

This item appears in the following Collection(s)

Show full item record