Browsing Local and Regional Documents Archive by Title

Navigation

Display Options

Results

  • Waldport (Or.) (Waldport, 2007-11-28)
    1. The lot area and density calculations for ocean and bay front properties are revised; 2. Development is restricted within the zone of riparian vegetation and 25 feet landward from the top of bluff; 3. Siting standards ...
  • Waldport (Or.) (Waldport, 2009-11-17)
    Update Waldport Development Code Section 16.68 Flood Hazard Overlay Zone to be in accordance with FEMA standards and continued eligibility in the National Flood Insurance Program.
  • Waldport (Or.) (Waldport, 2009-11-17)
    The amendment is a zone change from Planned Industrial Zone I-P to Residential Zone R-l, and a comprehensive plan map amendment from Planned Industrial to Residential Single to Tax Lot 500 of Lincoln County Tax Assessor's ...
  • Waldport (Or.) (Waldport, 2010-02-17)
    Update Waldport Comprehensive Plan !0 Goals and Policies, 2) Inventory, and 3) Transportation System Plan Section IV.
  • Waldport (Or.) (Waldport, 2011-05-04)
    The proposed text amendment provides regulations pertaining to tower facilities. The amendments provide a new definition of "tower"; restricts towers from being located in some zoning districts; allows tower facilities as ...
  • Waldport (Or.) (Waldport, 2012-04-25)
    F 'e amendments: A. Street Hammerheads (Vehicle Turnaround) required by the City and Fire District. B. Chickens and Ducks allowed wjrh restrictions. C. Geologic Hazards Report required on slopes of 20% or greater. D. ...
  • Waldport (Or.) (Waldport, 2012-07-05)
    The Yaquina John Point Land Use & Transportation Plan addresses future land use, Hwy 101 improvements, and local bicycle, pedestrian, and vehicle circulation for a 150 acre area located in west Waldport. The plan includes ...
  • Waldport (Or.) (City of Waldport, 2013-10-01)
  • Waldport (Or.) (City of Waldport, 2015-04-17)
  • Deschutes National Forest (Agency : U.S.) (2009-02)
    Walker Mountain is a designated electronic site located on the Crescent Ranger District on the Deschutes National Forest. The Deschutes National Forest proposes to issue a special use permit to Bonneville Power Administration ...
  • Wallowa (Or.) (City of Wallowa (Or.), 1983-04-26)
    This Land Use Plan is a public document prepared by the City Council with assistance and input from community residents. It provides long-range guidelines for decision-making with regard to land use suitability, development ...
  • Wallowa (Or.); David Evans and Associates (City of Wallowa (Or.), 2001-03)
    The Wallowa Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the transportation ...
  • Wallowa County (Or.) (Wallowa County (Or.), 2006-03-24)
    This plan contains information to assist landowners and homeowners in developing strategies that address protection from wildfire. Also, citizens within WUI areas are encouraged to work with land managers to address ...
  • Wallowa County (Or.); Wallowa County (Or.). Planning Dept. (Wallowa County (Or.), 2003-06-16)
    Wallowa County long-range planning includes preparation and maintenance of plan map and related goals, policies, and background information (essentially this document), which can be used as a guideline for land conservation ...
  • Wallowa County (Or.); Nez Perce Tribe of Idaho (Wallowa County (Or.), 1999-09)
    This document sets forth a plan to restore and maintain habitat for chinook salmon (Oncorhynchus tshawytscha) and, potentially, other salmonid fish in Wallowa County, Oregon. The goals for salmon recovery are to provide ...
  • Wallowa County (Or.) (Wallowa County (Or.), 2001-07-02)
    The Wallowa County Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...
  • Wallowa County (Or.); Stevens, Thompson & Runyan (Wallowa County (Or.), 1973-05)
    The basic goal of the study is to provide an environmental protection plan for the Wallowa Lake Basin. This will be facilitated through three general tasks: 1. Development of a land use plan, 2. Development of a water ...
  • Wallowa County (Or.); Stevens, Thompson & Runyan (Wallowa County (Or.), 1973-05)
    This technical supplement is intended to supply additional data which was not possible to present in the primary publication of the Comprehensive Plan, since that presentation was designed for the purpose of general public ...
  • Wallowa County (Or.) (Wallowa County, 2007-05-17)
  • Wallowa (Or.) (2012-12-21)

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics