Veneta : Total maximum daily load (TMDL) implementation plan

Show full item record

Title: Veneta : Total maximum daily load (TMDL) implementation plan
Author: Veneta (Or.)
Abstract: This document is the total maximum daily load (TMDL) Implementation Plan for the City of Veneta. This Plan describes the strategies that the City will implement to reduce temperature, bacteria, and mercury pollution in the Upper Willamette subbasin of the Willamette River. Implementation Plans from designated management agencies (DMAs), such as the City of Veneta, are required to comply with the Willamette Basin TMDL order and to help meet pollutant load allocations for the Upper Willamette subbasin as approved by the US Environmental Protection Agency (EPA) in September 2006. [From the Plan]
Description: 34 pp. Bookmarks supplied by UO. Maps, tables, figures. Adopted February 11, 2008. Captured November 13, 2008.
URI: http://www.ci.veneta.or.us/pdf/VenetaTMDLPlan4-09-08.pdf
http://hdl.handle.net/1794/7796
Date: 2008-02-11


Files in this item

Files Size Format View
Veneta_TMDL_Plan.pdf 715.6Kb PDF View/Open

This item appears in the following Collection(s)

Show full item record