1610 Roadside treatment project final decision memo

Show full item record

Title: 1610 Roadside treatment project final decision memo
Author: Umpqua National Forest (Agency : U.S.)
Abstract: Announces decision implementing roadside treatments by thinning, pruning, piling or chipping slash along the major roads (Forest Road 1610, 1610-050, 1610-100, 1610-500) within the lower Devil's Knob portion of the Elk Creek watershed. Trees and brush would be removed to bring the resulting condition to a Fuel Model 8 (an open stand with limited ground fuel) with low to moderate fuel loading resulting in healthier growing conditions for the stands. Treatment will occur alongside existing specified roads (generally 150' each side of road).
Description: 13 pp. Tables. T. 30S, R. 1W, Sec. 35 and 36; T. 31S, R. 1W, Sec. 1, 2 and 11; T. 31S, R. 1E, Sec. 6 and 7. Captured March 18, 2009.
URI: http://hdl.handle.net/1794/8843
Date: 2009-03-16


Files in this item

Files Size Format View
1610_Roadside_Treatment_Final_Decision_Memo.pdf 145.9Kb PDF View/Open

This item appears in the following Collection(s)

Show full item record