Metro : Trolley Trail master plan (2004)

Show full item record

Title: Metro : Trolley Trail master plan (2004)
Author: Metro (Or.); North Clackamas Parks & Recreation District; Metro (Or.). Regional Parks and Greenspaces Dept.; Adolfson Associates; JD White (Firm)
Abstract: The proposed Trolley Trail will run along a historic corridor once used by a streetcar line that operated between Portland and Oregon City.... acquired a 6-mile stretch of the historic rail corridor between downtown Milwaukie and Gladstone. The trail connects with existing bike lanes in Milwaukie and Gladstone and will complete an essential link in Metro's Regional Trail System. When completed, the Trolley Trail and connecting trails will create a continuous 20- mile loop connecting Portland, Milwaukie, Gladstone, Oregon City and Gresham. [From the Plan]
Description: 147 pp. Bookmarks supplied by UO. Maps, charts, tables, figures, illus., appendices. Published January, 2004. Captured January 28, 2009.
URI: http://www.oregonmetro.gov/files/planning/trolleytrailplan.pdf
http://hdl.handle.net/1794/9253
Date: 2004-01


Files in this item

Files Size Format View
Metro_Trolley_Trail_Master_Plan.pdf 16.06Mb PDF View/Open

This item appears in the following Collection(s)

Show full item record