Bend, Oregon Planning Documents
Permanent URI for this collection
Browse
Browsing Bend, Oregon Planning Documents by Author "Carollo Engineers"
Now showing 1 - 1 of 1
Results Per Page
Sort Options
Item Open Access Bend : Water reclamation facilities plan : Technical memorandum No. 4(City of Bend (Or.), 2008-04) Carollo Engineers; Bend (Or.)The Bend Water Reclamation Facility (WRF) currently consists of the following liquid treatment processes: preliminary treatment; primary clarification; activated sludge using a Modified Ludzack Ettinger (MLE) process; secondary clarification; tertiary filtration (seasonal usage for production of Level IV reclaimed water); and chlorine disinfection. This Technical Memorandum (TM) summarizes the evaluation of the preliminary, primary, secondary, and tertiary processes. [From the document]