Roseburg District
Permanent URI for this collection
Browse
Browsing Roseburg District by Subject "Forest roads -- Oregon -- Design and construction"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
Item Open Access North Berry Creek unilateral right-of-way and road construction permit finding of no significant impact(2008-01) United States. Bureau of Land Management. Roseburg District OfficeDetermines no environmental impact statement is needed for project proposing construction of an extension to BLM Road No. 29-7-7.0 in Section 7, T. 29 S., R. 7 W. The road extension, approximately 675 feet in length, would be temporary and unsurfaced, and located primarily on a ridge top location. Approximately 440 feet of construction would be located on BLM-managed lands, as the proposed road route crosses back and forth at three locations along the property line between BLM lands and the Delores P. Loftin Trust lands that are to be logged. This action would be authorized under an O&C Right-of-Way Permit. BLM timber cut in association with the road construction would be purchased by Swanson Group, LLC through a negotiated timber sale.Item Open Access Rone access decision document(2008-07-07) United States. Bureau of Land Management. Roseburg District OfficeAnnounces decision to authorize implementation of the Proposed Action Alternative as described in the Rone Access Environmental Assessment. The Rone Access will be a 40 foot road, taking off of the 24-3-30.0 road. Construction of the temporary road will occur on Bureau of Land Management administered lands and will be permitted for the period of three years. This project is on a ridge top within the General Forest Management Area Land Use Allocation.