North South OHV trail project decision memo

dc.contributor.authorUmatilla National Forest (Agency : U.S.)
dc.date.accessioned2009-03-16T23:36:14Z
dc.date.available2009-03-16T23:36:14Z
dc.date.issued2009-03-02
dc.description10 pp. Tables. The planning area includes portions of T9N, R42E, Sections 16, 17, 19, 20, 29, and 32; T8N, R42E, Sections 5, 8, 9, 14-16, 22, 23, 25, 26, and 36; T8N, R43 E, Sections 28, 29, 31-36; T8N, R44E, Section 32; and T7N, R44E, Section 2-6 and 10. Captured March 16, 2009.en
dc.description.abstractAnnounces decision initiating project developing a designated OHV trail by using existing roads, existing areas of past disturbance (skid trails, temporary logging roads, and firelines), and minimal new trail construction (5.5 miles) along road corridors of FRs 40, 43, and 44. This trail will move ATV and motorcycle traffic from approximately 12.7 miles of motorized mixed-use traffic on FR 40 to approximately 11.9 miles of newly designated ATV trail that parallels the road. The entire trail will be approximately 30 miles long and will provide ATV access from Stevens Ridge to Big Butte. It will be designed and designated for use by ATVs and motorcycles.en
dc.identifier.urihttps://hdl.handle.net/1794/8794
dc.language.isoen_USen
dc.relation.ispartofseriesNEPA;
dc.subjectOff-road vehicles -- Umatilla National Forest (Or. and Wash.)en
dc.subjectForest management -- Umatilla National Forest (Or. and Wash.)en
dc.subjectTrails -- Umatilla National Forest (Or. and Wash.)en
dc.titleNorth South OHV trail project decision memoen
dc.title.alternativeDecision memo: North South OHV trail projecten
dc.typeOtheren

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
North_South_Off-Highway_Vehicle_Trail_Project_Decision_Memo.pdf
Size:
123.35 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Name:
license.txt
Size:
1.79 KB
Format:
Item-specific license agreed upon to submission
Description: