Midstate Electric Cooperative power line relocation environmental assessment
dc.contributor.author | Bend-Fort Rock Ranger District (Or.) | |
dc.date.accessioned | 2008-07-23 | |
dc.date.available | 2008-07-23 | |
dc.date.issued | 2005-10 | |
dc.description | 45 pp. Tables, references, maps. Township 18 South, Range 11 East, Sections 10, 11, 14, 15 & 22. Captured May 17, 2007. | en |
dc.description.abstract | Proposes to reroute a portion of an existing 69-kV power line by constructing a power line corridor for approximately 3.5 miles. Includes removing trees from approximately 12.6 acres, clearing trees, drilling 10-foot deep holes to install wooden utility polls 70 feet high, and installing conductor wire. About 3.5 miles of existing power line would be removed from federal and private land. | en |
dc.format.extent | 158006 bytes | |
dc.format.mimetype | application/pdf | |
dc.identifier.uri | https://hdl.handle.net/1794/6921 | |
dc.language.iso | en_US | en |
dc.relation.ispartofseries | NEPA | en |
dc.subject | Forest management -- Oregon -- Deschutes National Forest | en |
dc.subject | Overhead electric lines -- Environmental aspects -- Oregon | en |
dc.subject | Overhead electric lines -- Location -- Oregon | en |
dc.title | Midstate Electric Cooperative power line relocation environmental assessment | en |
dc.title.alternative | Environmental assessment: Midstate Electric Cooperative power line relocation | en |
dc.type | Other | en |