Midstate Electric Cooperative power line relocation environmental assessment

dc.contributor.authorBend-Fort Rock Ranger District (Or.)
dc.date.accessioned2008-07-23
dc.date.available2008-07-23
dc.date.issued2005-10
dc.description45 pp. Tables, references, maps. Township 18 South, Range 11 East, Sections 10, 11, 14, 15 & 22. Captured May 17, 2007.en
dc.description.abstractProposes to reroute a portion of an existing 69-kV power line by constructing a power line corridor for approximately 3.5 miles. Includes removing trees from approximately 12.6 acres, clearing trees, drilling 10-foot deep holes to install wooden utility polls 70 feet high, and installing conductor wire. About 3.5 miles of existing power line would be removed from federal and private land.en
dc.format.extent158006 bytes
dc.format.mimetypeapplication/pdf
dc.identifier.urihttps://hdl.handle.net/1794/6921
dc.language.isoen_USen
dc.relation.ispartofseriesNEPAen
dc.subjectForest management -- Oregon -- Deschutes National Foresten
dc.subjectOverhead electric lines -- Environmental aspects -- Oregonen
dc.subjectOverhead electric lines -- Location -- Oregonen
dc.titleMidstate Electric Cooperative power line relocation environmental assessmenten
dc.title.alternativeEnvironmental assessment: Midstate Electric Cooperative power line relocationen
dc.typeOtheren

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Midstate_Electric_Cooperative_Power_Line_Relocation_Project_EA.pdf
Size:
154.3 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
Name:
license.txt
Size:
2.21 KB
Format:
Item-specific license agreed upon to submission
Description: