Browsing Transportation plans (county) by Title

Navigation

Display Options

Results

  • Umatilla County (Or.); Oregon. Dept. of Transportation; Oregon. Dept. of Land Conservation and Development; DKS Associates; Stanfield (Or.); Echo (Or.) (Oregon Dept. of Transportation, 2005-11)
    This IAMP is a joint effort between ODOT, the City of Stanfield, the City of Echo and Umatilla County to ensure the I-84/Stanfield interchange area can meet future transportation needs. The transportation benefits of ...
  • Umatilla County (Or.); David Evans and Associates (Umatilla County (Or.), 2002-04)
    The Umatilla County Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities in Umatilla County for the next 20 years. This ...
  • Oregon. Dept. of Transportation; Kittelson & Associates; Umatilla County (Or.) (Umatilla County (Or.), 2007-10)
    [T]he US 730 Corridor Refinement Plan was developed to identify circulation and access-management strategies that would address the corridor’s near- and long-term safety needs. [From the Plan]
  • Umatilla County (Or.); H. Lee & Associates (Umatilla County (Or.), 2004-01-12)
    The purpose of the Umatilla County Westland Road /I-84 /I-82 Interchange Area Transportation Plan is to supplement and refine the Umatilla County Transportation System Plan in the project planning area. The goal of the ...
  • Lynn D. Steiger & Associates; Union County (Or.) (Union County (Or.), 1979-04)
    The Union County Transportation Plan is a Comprehensive Plan Element prepared to be a guide in transportation planning and to improve the decision-making involving transportation. It is also hoped that this document ...
  • Union County (Or.); Decker, Dara; Warren, Stacy; Hartell, Scott; Jenkins, Hanley; Union County (Or.). Planning Dept. (Union County (Or.), 1999-08)
    The Union County Transportation System Plan (TSP) identifies existing transportation facilities and provides guidelines for future planned and constructed transportation facilities until the year 2018. This TSP updates ...
  • Wallowa County (Or.) (Wallowa County (Or.), 2001-07-02)
    The Wallowa County Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This Transportation System ...
  • Wasco County (Or.); Mid-Columbia Economic Development District (Mid-Columbia Economic Development District, 2007-04)
    This document is a coordinated transportation plan focused on addressing the transportation needs of low income individuals, individuals with disabilities, and seniors residing in Wasco County. [From the Plan]
  • Wasco County (Or.); Mid-Columbia Economic Development District (Mid-Columbia Economic Development District, 2009-04-16)
    This document is an update to the 2007-2010 Wasco County Coordinated Transportation Plan. Mid- Columbia Economic Development District, under contract with the Association of Oregon Counties prepared this plan update. It ...
  • Washington County (Or.); Oregon. Dept. of Transportation; David Evans and Associates (Oregon Dept. of Transportation, 2003-07)
    This plan includes an access management strategy that addresses two of the special IGA conditions detailed below: three access points located north of the new off ramp would be closed. A new service/access road will ...
  • Washington County (Or.); Oregon. Dept. of Transportation; David Evans and Associates; Angelo Eaton & Associates; Greenfield, Mark J.; Cogan Owens Cogan (Firm) (Oregon. Dept. of Transportation, 2003-01-06)
    This IAMP has been developed concurrent with refinement of the preliminary design of the interchange and with the reevaluation of an environmental assessment previously prepared for the interchange project. The objectives ...
  • Washington County (Or.) (Washington County (Or.), 2005-06)
    This design reference is intended as a guideline for pedestrian enhancements called for by provisions of the 2020 Transportation Plan and the Community Development Code. The designs included in this booklet are intended ...
  • Washington County (Or.). Dept. of Land Use and Transportation; Washington County (Or.) (Washington County (Or.), 1996-02)
    The general purposes of the CIP include 1) evaluating capital project needs identified in the Transportation Plan for implementation over the coming five-year period, 2) encouraging and guiding the efficient allocation ...
  • Washington County (Or.); Washington County (Or.). Planning Dept.; DKS Associates; Julie Sosnovske P.E.; Chris Maciejewski (Washington County (Or.), 2002-10-29)
    The Transportation Plan is a comprehensive analysis and identification of transportation needs associated with the development patterns described in the community plans and the Rural/Natural Resource Plan. Prepared from ...
  • Wheeler County (Or.); David Evans and Associates (Wheeler County (Or.), 2001-06)
    The Wheeler County Transportation System Plan (TSP) guides the management of existing transportation facilities and the design and implementation of future facilities for the next 20 years. This TSP constitutes the ...
  • Yamhill County (Or.) (Yamhill County (Or.), 2004-09-30)
    Yamhill County Transportation System Plan (TSP) examines both short and long-term transportation needs. In the short term, the study identifies and provides solutions to immediate safety and congestion problems. For the ...