  • Detroit Ranger District (Or.) (2002-07)
    Announces decision to implement Alternative 3 of project EA, which modifies the action to include operating restrictions for helicopter, timber harvest, and truck hauling to reduce the effects of noise on recreation visitors ...
  • Sweet Home Ranger District (Or.) (2002-08-02)
    Proposes to offer one or more timber sales treating no more than 275 acres in the Parks Creek Subwatershed. Timber will be removed from the existing shelterwood and overstory management prescriptions with ground-based ...
  • South Zone Ranger District (Or.) (2002-09)
    Announces decision to implement Alternative 1 of the project EA, except for adding large wood to Sweet and Walker Creeks. Includes package of two separate restoration actions: one, focusing on terrestrial restoration by ...
  • Crescent Ranger District (Or.) (2002-09)
    Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from ...
  • Detroit Ranger District (Or.) (2002-10-29)
    Announces decision to implement Alternative 4 eliminating the built-in mooring docks and the conceptual design changes in Alternative 5, converting and reconstructing the Upper Arm Recreation Site to a formal day-use site ...
  • Crescent Ranger District (Or.) (2002-11-05)
    Proposes to replace the current 4-culvert structure with a single, open-bottom arch structure. Includes removal of existing structure to streambed elevation, with embankment materials conserved and culverts removed from ...
  • Detroit Ranger District (Or.) (2002-12)
    Proposes to treat eight forest stands totaling an estimated 187 acres within the East Humbug Creek drainage by removing most trees below 11 inches in diameter by either commercial thinning or understory removal or a ...
  • Sisters Ranger District (Or.) (2002-12)
    Proposes to implement fuel reduction and forest health management activities on 12,648 acres to reduce risk of wildfire, insects and disease; protect the safety of people, property, and tribal and natural resources; restore ...
  • Bend-Fort Rock Ranger District (Or.) (2003-01)
    Proposes to improve access and habitat available to fish, and to restore the natural sediment regime to the stream segment by removing the dam and the accumulated sand and salt, grading the stream bottom to the same slope ...
  • Deschutes National Forest (Agency : U.S.) (2003-01-15)
    Announces decision to implement Alternative 2 of the project EA, authorizing the sale of the federal assets of the Bend Pine nursery property that is no longer needed for National Forest purposes. Includes approximately ...
  • Bend-Fort Rock Ranger District (Or.) (2003-02)
    Proposes to remove, reconfigure, and replace the boat ramp and docking area, dredge to improve access to open water from the boat ramp, and redesign the parking areas to incorporate increased and designated parking that ...
  • Bend-Fort Rock Ranger District (Or.) (2003-02)
    Announces decision to implement Alternative 3 of project EA, developing and designating approximately 9 miles of non-motorized trail from the northern boundary of Sunriver to Benham Falls Day Use Area to Lava Lands Visitor Center.
  • Bend-Fort Rock Ranger District (Or.) (2003-02)
    Proposes to develop and designate approximately 9 miles of non-motorized trail from the northern boundary of Sunriver to Benham Falls Day Use Area to Lava Lands Visitor Center.
  • McKenzie River Ranger District (Or.) (2003-03)
    Proposes to implement portion of recommendations found in the Blue River Landscape Strategy, a recommended landscape management and watershed restoration plan, an administrative study designed to measure effects on the ...
  • Bend-Fort Rock Ranger District (Or.) (2003-03)
    Proposes to construct a previously authorized 4-acre snow play hill with 3-5 runs cleared of vegetation, a warming shelter, a single vault toilet, a 100-vehicle parking area, and a 600-foot road access to Cascades Lakes ...
  • Bend-Fort Rock Ranger District (Or.) (2003-03)
    Announces decision to categorically exclude authorization of a special 5-year use permit to Rock Springs Guest Ranch for the non-exclusive use of approximately 25.3 miles of trail and road. Includes constructing .3 miles ...
  • Sweet Home Ranger District (Or.) (2003-03-11)
    Announces decision to implement Article 3 of the project EA, harvesting 3.2 million board feet on 237 acres of existing shelterwood and prelogged overstory units in Matrix land allocation using ground-based logging methods. ...
  • Lookout Mountain Ranger District (Or.) (2003-03-11)
    Announces implementation of Alternative 4 of project EA, conducting forest vegetation management activities on approximately 11,300 acres, including commercial timber harvest (1945 acres), precommercial thinning (5118 ...
  • Crooked River National Grassland (Or.) (2003-03-26)
    Proposes installation of a new fiber optic line, primarily on existing poles, within the existing right-of-way for the Central Electric Cooperative, Inc. (CEC) power transmission line. Designed to complement the earlier ...
  • Paulina Ranger District (Or.) (2003-04)
    Proposes to salvage approximately 514 MBF of trees that are dying or were killed by the July 2002 wildfire, and to plant conifers within a 140-acre area. Includes seedling protective measures against big game and pocket ...