Browsing Detroit Ranger District by Subject "Forest roads -- Oregon -- Willamette National Forest"

Navigation

Display Options

Results

  • Detroit Ranger District (Or.) (2007-01)
    Announces decision to implement Alternative 5 of the project EA, implementing timber harvest on approximately 751 acres, modified by converting some of the regeneration units to thinning units, and altogether dropping two ...
  • Detroit Ranger District (Or.) (2006-11)
    Proposes to harvest timber in overstocked, managed stands over 40 years-old and overstocked, 100 year-old fire regenerated stands on about 985 acres, with commercial thinning on 926 acres and regeneration harvest on 59 ...
  • Willamette National Forest (Agency : U.S.) (2008-09)
    Announces decision to select Alternative 3 to implement timber harvest on approximately 1276 acres of densely stocked, previously managed stands within the French Bug project area. This alternative will include commercial ...
  • Willamette National Forest (Agency : U.S.) (2008-07)
    Proposes harvesting 1255 of 2200 acres of stands. Approximately 945 acres would remain untreated. Also includes maintenance and construction of roads.
  • Detroit Ranger District (Or.) (2005-08)
    Announces decision to implement Alternative 2 of the project EA, to clear one acre of land immediately adjacent to the existing quarry of existing vegetation, strip it of topsoil, quarry it, and stockpile on the existing ...
  • Detroit Ranger District (Or.) (2005-06)
    Proposes to expand existing rock source on the edge of the existing area in an 18 year-old conifer plantation 2 miles west of Cub Point in order to provide aggregate for road reconstruction and maintenance. Expansion would ...
  • Detroit Ranger District (Or.) (2007-10)
    Announces decision to implement Alternative 2 to begin harvesting timber (including thinning, shelterwood, and regeneration harvest) on about 1668 acres. Includes reopening of 3.5 miles of temporary spur roads and maintenance ...
  • Detroit Ranger District (Or.) (2007-07)
    Proposes to harvest timber on 1668 acres, yielding about 19 million board feet. Includes about 834 acres of final shelterboard (overstory) removal, 52 acres of shelterboard creation, 3 acres of clearcut with reserves, 633 ...
  • Detroit Ranger District (Or.) (2002-07)
    Proposes to thin approximately 1136 acres of second growth Douglas fir stands to reduce stocking levels, thin selected portions of riparian reserves, reconstruct roads, and build temporary roads in order to enhance the ...
  • Detroit Ranger District (Or.) (2002-07)
    Announces decision to implement Alternative 3 of project EA, which modifies the action to include operating restrictions for helicopter, timber harvest, and truck hauling to reduce the effects of noise on recreation visitors ...
  • Detroit Ranger District (Or.) (2007-05-02)
    Announces decision to implement Alternative 2, constructing 100 parking places, a scenic overlook, new toilet, picnic tables, wooden rails and barriers, and information and educational signage.
  • Detroit Ranger District (Or.) (2007-03)
    Proposes to promote a safer, family-friendly atmosphere by providing a basic physical infrastructure, reconstructing road and parking areas, limiting capacity and fixing location, delineating and improving trails and ...

Search Scholars' Bank


Advanced Search

Browse

My Account

Statistics