Now showing items 168-187 of 232

    • Paulina Falls overlook decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.) (2002-04-10)
      Announces decision to implement Alternative B of project EA, providing accessibility, safety, and positive aesthetics for the visiting public along the north rim of the Paulina Creek. Includes constructing a rock overlook ...
    • Paulina Falls overlook environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2002-03-06)
      Proposes to provide accessibility, safety, and positive aesthetics for the visiting public along the north rim of Pauline Creek. Includes constructing a rock overlook on the north side of the Creek with a metal railing on ...
    • Pick-up salvage harvest decision notice and finding of no significant impact 

      Lookout Mountain Ranger District (Or.) (2001)
      Announces decision to implement Alternative 2 of project EA, salvage harvesting merchantable trees that were felled during fire suppression operations near existing roads in the Hash Rock Salvage area. Trees proposed for ...
    • Pick-up salvage harvest environmental assessment 

      Lookout Mountain Ranger District (Or.) (2001-02)
      Proposes to salvage harvest merchantable trees that were felled during fire suppression operations near existing roads in the Hash Rock Salvage area. Trees proposed for harvest are between 15 and 35 inches dbh, and the ...
    • Pine Mountain Observatory master plan environmental analysis environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2004-02)
      Proposes to reissue a special use permit of 20 years to the University of Oregon for its research facility, for which it has built 3 telescopes, quarters for visiting researchers and staff, a site manager's residence, ...
    • Rager wildland urban interface (WUI) fuels project decision memo 

      Paulina Ranger District (Or.) (2007-09-06)
      Announces implementation of underburning of 2770 acres, non-commercial thinning of 1000 acres, and machine piling of 123 acres to reduce the threat of uncharacteristically intense wildfire.
    • RCC, Atlantic Wampus Butte communications site building and tower decision memo 

      Bend-Fort Rock Ranger District (Or.) (2006-09-27)
      Announces decision to issue a communication lease to RCC, Atlantic, Inc. to construct a building at the Wampus Butte communications site, to be constructed, operated and maintained as a cellular base station facility to ...
    • Road 18 cave project environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2001-06)
      Proposes to preserve and protect cave resources of the eight caves located within the Arnold lava tube system and Skeleton Cave by making adjustments designed to reduce or eliminate impacts to caves and cave resources from ...
    • Road 18 caves project decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.) (2001-08-30)
      Proposes to preserve and protect cave resources of the eight caves located within the Arnold lava tube system and Skeleton Cave by making adjustments designed to reduce or eliminate impacts to caves and cave resources from ...
    • Roads analysis report for Eyerly project area 

      Sisters Ranger District (Or.) (2003-04)
      Analyzes road conditions on the 66.8 square miles of land accessed by 161.3 miles of road. Six-part process includes: setting up the analysis, describing the situation, identifying issues, assessing benefits, problems and ...
    • Rock Springs trails special use permit decision memo 

      Bend-Fort Rock Ranger District (Or.) (2003-03)
      Announces decision to categorically exclude authorization of a special 5-year use permit to Rock Springs Guest Ranch for the non-exclusive use of approximately 25.3 miles of trail and road. Includes constructing .3 miles ...
    • Round Lake Christian Camp decision memo 

      Sisters Ranger District (Or.) (2006-08-10)
      Announces decision to approve the master plan for the reconstruction of Round Lake Christian Camp following the destruction of the August 2003 B&B Complex Fire. Includes rebuilding cabins, shower, bath facilities and ...
    • Ryan Ranch Meadow/Aspen/Willow enhancement project final decision memo 

      Bend-Fort Rock Ranger District (Or.) (2008-03-25)
      Announces decision to improve habitat conditions on approximately 95 acres of existing upland meadow, aspen and willow habitats in the Ryan Ranch Meadow area west of the Deschutes River by broadcast burning approximately ...
    • Ryan Ranch Meadow/Aspen/Willow enhancement project preliminary decision memo 

      Bend-Fort Rock Ranger District (Or.) (2007-10-25)
      Announces decision to improve habitat conditions on approximately 95 acres of existing upland meadow, aspen and willow habitats in the Ryan Ranch meadow area west of the Deschutes River by broadcast burning approximately ...
    • Sanitation environmental assessment decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.); Sisters Ranger District (Or.) (2002-01-31)
      Announces decision to implement Alternative B of project EA, with mitigation measures, to remove 13 existing toilets at 11 different recreational sites, install 14 toilets at the same 11 recreational sites, install 4 new ...
    • Section 23 easement and road adustment environmental assessment 

      Sisters Ranger District (Or.) (2000-10-10)
      Proposes to evaluate request by David Hermann of Pumpkin Pine LLC to abandon, relocate and consolidate some Forest Service road and rail easements across his private lands and build short sections of new road and trail to ...
    • Seven Buttes return vegetation management project environmental assessment 

      Crescent Ranger District (Or.) (2001-07)
      Proposes to address opportunities for restoring ecosystems identified during the Odell Watershed Analysis (1999), Big Marsh Watershed Analysis (1997), and to implement the management strategy defined for the Davis Late ...
    • Seven Buttes return vegetation managment project part A decision notice and finding of no significant impact 

      Crescent Ranger District (Or.) (2001-07-23)
      Announces decision to restore ecosystems identified during the Odell Watershed Analysis (1999), Big Marsh Watershed Analysis (1997), and to implement the management strategy defined for the Davis Late Successional Reserve ...
    • Seventh Mountain rock pit expansion environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2000-07-10)
      Proposes to expand the Pit to access sand, gravel and aggregate material for use on the Forest for about the next 20 years. Includes using dozers with push blades, loaders and rock crushers, clearing trees from about 7 ...
    • Sisters admin site land conveyance environmental assessment 

      Sisters Ranger District (Or.) (2006-12)
      Proposes to sell 68 acres of National Forest property to raise funds to build a new ranger station on the remaining 12 acres of the property, complete a small land exchange, and amend the Forest Plan allocation designations.