Now showing items 1-20 of 232

    • 18 Fire recovery project draft environmental impact statement 

      Bend-Fort Rock Ranger District (Or.) (2004-06)
      Describes the effects of implementing 3 alternatives for the recovery of Bend-Fort Rock Ranger District lands that burned 3810 acres in the 18 Fire of 2003. Seeks to recover commercial value, expedite the establishment ...
    • 18 Fire recovery project final environmental impact statement 

      Bend-Fort Rock Ranger District (Or.) (2004-10)
      Describes the effects of implementing 3 alternatives for the recovery of Bend-Fort Rock Ranger District lands that burned 3810 acres in the 18 Fire of 2003. Seeks to recover commercial value, expedite the establishment and ...
    • 18 Fire recovery project record of decision 

      Bend-Fort Rock Ranger District (Or.) (2004-11)
      Announces decision to implement Alternative 2 of project FEIS, regarding Bend-Fort Rock Ranger District Fire 18 that burned 3810 acres in 2003. Seeks to recover commercial value, expedite the establishment and restoration ...
    • 18-Fire competing vegetation control project decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.) (2006-02-17)
      Announces decision to implement Alternative 2 of the project EA, providing for an economic and affordable means of controlling competing vegetation so that planted ponderosa pine seedlings can become established after the ...
    • 18-Fire competing vegetation control project environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2006-02)
      Proposes to provide for an economical and affordable means of controlling competing vegetation so that planted ponderosa pine seedlings can become established after the deforestation caused by the 18-Fire. Includes carrying ...
    • 18-Fire competing vegetation control project environmental assessment 30-day comment period 

      Bend-Fort Rock Ranger District (Or.) (2005-12)
      Proposes to provide for an economical and affordable means of controlling competing competition so that planted ponderosa pine seedlings can become established after the deforestation caused by the 18-Fire. Includes carrying ...
    • 2006 small tree thinning decision memo 

      Crescent Ranger District (Or.) (2006-01-11)
      Announces decision to categorically exclude and proceed with project thinning small trees on approximately 151 acres in 7 units to relieve overcrowding. Includes thinning 15-20 year-old trees not larger than 7 inches in ...
    • 2007 Big Marsh meadow rehabilitation project preliminary decision memo 

      Crescent Ranger District (Or.) (2007)
      Announces decision to categorically exclude and proceed with project to enhance the meadow through cutting and girdling encroaching lodgepole pine into the meadow, and prescribed burning. Includes cutting trees 15-25 ...
    • 2007 Spruce Creek riparian rehabilitation decision memo 

      Crescent Ranger District (Or.) (2007-12-13)
      Announces decision to categorically exclude and proceed with project implementing a riparian meadow/hydrologic function restoration project on 100 acres of Spruce Creek and an adjacent stringer meadow. Includes thinning ...
    • 2007 Spruce Creek riparian rehabilitation preliminary decision memo 

      Crescent Ranger District (Or.) (2007-09-12)
      Announces decision to categorically exclude and proceed with project implementing a riparian meadow/hydrologic function restoration project in Spruce Creek and an adjoining stringer meadow. Includes thinning select lodgepole ...
    • 2008 small tree thinning preliminary decision memo 

      Crescent Ranger District (Or.) (2008-04-28)
      Announces decision to categorically exclude and proceed with project thinning small trees on approximately 2590 acres in 89 units to increase the growth and health of overcrowded stands not likely of commercial value. ...
    • Aspen planning area vegetation management decision notice and finding of no significant impact 

      Bend-Fort Rock Ranger District (Or.) (2005)
      Announces decision to implement Alternative 3 of project EA, improving and protecting deer winter range by reducing the risk of insect outbreaks, the spread of disease pathogens and high intensity wildfire that could further ...
    • Aspen planning area vegetation management environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2004-04)
      Proposes to improve and protect deer winter range by reducing the risk of insect outbreaks, the spread of disease pathogens and high intensity wildfire that could further jeopardize critical deer habitat, which presently ...
    • Aspen planning area vegetation management final environmental assessment 

      Bend-Fort Rock Ranger District (Or.) (2005-03)
      Proposes to improve and protect deer winter range by reducing the risk of insect outbreaks, the spread of disease pathogens and high intensity wildfire that could further jeopardize critical deer habitat, which is lacking ...
    • B&B Fire recovery project draft environmental impact statement 

      Sisters Ranger District (Or.) (2005-03)
      Proposes to harvest fire-killed and damaged trees, reduce fuels, plant trees, remove trees that are hazardous to public safety, and reduce unneeded roads. Includes salvage harvesting on 6803 acres, removal or cutting of ...
    • B&B Fire recovery project final environmental impact statement 

      Sisters Ranger District (Or.) (2005-06-30)
      Proposes to harvest fire-killed and damaged trees, reduce fuels, plant trees, remove trees that are hazardous to public safety, and reduce unneeded roads. Includes salvage harvest, fuels reduction and reforestation on ...
    • B&B Fire recovery project record of decision 

      Sisters Ranger District (Or.) (2005-08-02)
      Announces decision implementing Alternative 2 of project FEIS, harvesting fire-killed and damaged trees, reducing fuels, planting trees, removing trees that are hazardous to public safety, and reducing unneeded roads. ...
    • Badger Creek culvert and road closure project environmental assessment 

      Lookout Mountain Ranger District (Or.) (2002-06)
      Proposes to replace the existing culvert that obstructs fish passage with an aluminum box culvert with a natural bottom substrate. The fill removed would be used to close Forest Road 22-800, and a bypass road 128 feet long ...
    • Baja 58 project (fiscal year 2000 portion) decision notice and finding of no significant impact 

      Crescent Ranger District (Or.) (2000-02-28)
      Announces decision to include further vegetation management activities with those of Alternative 3 of September 1998. Includes understory thinning of 2762 acres, prescribe burning of 904 acres of fire-tolerant stands to ...
    • Baja 58 project (fiscal year 1998 portion) decision notice and finding of no significant impact 

      Crescent Ranger District (Or.) (1998-09-30)
      Announces decision to implement modified version of Alternative 3 of project EA, understory thinning 5570 acres, harvesting 2.1 MMBF of salvage and 12.4 MMBF, and construction/reconstruction of 10.2 miles of road.