Deschutes and Ochoco National Forests: Recent submissions

  • Lookout Mountain Ranger District (Or.) (2008-08)
    Proposes to reauthorize grazing and issue grazing permits for the Crystal Springs and Burn allotments, addressing the demand for livestock forage, and also the concerns over increased water temperature, decreased bank ...
  • Sisters Ranger District (Or.) (1999-05)
    Proposes to sell 240 acres of National Forest lands under the authority of the 1958 National Forest Townsite Act to the city for a sewage and wastewater facility system. Conveyance would be limited to that essential to ...
  • Lookout Mountain Ranger District (Or.) (2007-09-27)
    Announces decision to reauthorize livestock grazing under the same terms and conditions as the current grazing management, which is for 1100 ewe/lamb pairs from June 16 to September 30 for a total of 1177 Animal Unit Months ...
  • Lookout Mountain Ranger District (Or.) (2008-07)
    Proposes to use commercial timber harvest, pre-commercial thinning, grapple piling, hand piling, and prescribed fire in the eastern half of the Maury Mountains for the treatment of fuels and vegetation management. Includes ...
  • Lookout Mountain Ranger District (Or.) (2007-04)
    Proposes to harvest commercially approximately 6172 acres of commercial harvest, 11,160 acres of precommercial thinning, and 196 acres of thinning in hardwood stands. Includes some 15,464 acres of prescribed fire, 3015 ...
  • Lookout Mountain Ranger District (Or.) (2007-06-15)
    Announces decision to implement salvage harvest to recover the economic value of approximately 100 MBF of blown down timber. Most of the down trees are ponderosa pine and will be harvested using tractor logging methods.
  • Lookout Mountain Ranger District (Or.) (2008-07-08)
    Announces decision implementing modified version of Alternative 2 of FEIS, using commercial timber harvest, pre-commercial thinning, grapple piling, hand piling, and prescribed fire in the eastern half of the Maury Mountains ...
  • Lookout Mountain Ranger District (Or.) (2008-04)
    Proposes to use commercial timber harvest, pre-commercial thinning, grapple piling, hand piling, and prescribed fire in the eastern half of the Maury Mountains for the treatment of fuels and vegetation management. Includes ...
  • Sisters Ranger District (Or.) (2003-04)
    Analyzes road conditions on the 66.8 square miles of land accessed by 161.3 miles of road. Six-part process includes: setting up the analysis, describing the situation, identifying issues, assessing benefits, problems and ...
  • Bend-Fort Rock Ranger District (Or.) (2005-12)
    Announces decision to be made will be to issue a special use permit for prospecting to Empire Stone Company to explore for decorative stone material. Includes digging up to 10 holes approximately 5'x 5' in size in preselected ...
  • Bend-Fort Rock Ranger District (Or.) (2003-05)
    Announces decision to categorically exclude project closing 5 user created roads adjacent to Newberry National Volcanic Monument. The approximately 1/4 mile of road, which leads to user created dispersed campsites along ...
  • Bend-Fort Rock Ranger District (Or.) (2003-05)
    Announces decision to categorically exclude project reconstructing approximately 9 miles and relocating .75 miles of Nordic ski trails located in or adjacent to Newberry National Volcanic Monument. Includes using chainsaw ...
  • Crescent Ranger District (Or.) (2002-01)
    Proposes to expand the clearing limits at the airport by clearing trees lining the runway to a distance of 75 feet from each side of the existing runway. The total width of the cleared area would total approximately 300 ...
  • Crescent Ranger District (Or.) (1998-09-30)
    Announces decision to implement modified version of Alternative 3 of project EA, understory thinning 5570 acres, harvesting 2.1 MMBF of salvage and 12.4 MMBF, and construction/reconstruction of 10.2 miles of road.
  • Crescent Ranger District (Or.) (2000-02-28)
    Announces decision to include further vegetation management activities with those of Alternative 3 of September 1998. Includes understory thinning of 2762 acres, prescribe burning of 904 acres of fire-tolerant stands to ...
  • Sisters Ranger District (Or.) (2006-08-10)
    Announces decision to approve the master plan for the reconstruction of Round Lake Christian Camp following the destruction of the August 2003 B&B Complex Fire. Includes rebuilding cabins, shower, bath facilities and ...
  • Sisters Ranger District (Or.) (1999-07-26)
    Announces decision to implement Alternative C of the project EA, immediately approving 160 of the 240 acres of National Forest lands for conveyance to the City of Sisters under the authority of the 1958 National Forest ...
  • Sisters Ranger District (Or.) (2002-04-03)
    Proposes to exchange the Lake Creek property, privately held by Metolius, LLC, for the Forest Service-owned Cliff and School properties. The Cliff property currently has an encroachment authorized by a special use permit ...
  • Sisters Ranger District (Or.) (2002-12)
    Proposes to implement fuel reduction and forest health management activities on 12,648 acres to reduce risk of wildfire, insects and disease; protect the safety of people, property, and tribal and natural resources; restore ...
  • Sisters Ranger District (Or.) (2001-06)
    Friends of the Metolius proposed that the Forest Service analyze and implement this collaborative project as a demonstration of forest management methods, with the interest of educating the public about the need for, and ...